Chord Line, Tamil Nadu
Chord Line | |
---|---|
Overview | |
Other name(s) | Viluppuram - Trichy railway line |
Native name | கார்டு லைன் |
Type | Regional rail Heavy rail Light rail |
Status | Operating |
Locale | Tamil Nadu |
Termini | Viluppuram Jn Tiruchirappalli Jn |
Stations | 29 |
Services | 1 |
Website | www |
Operation | |
Opened | 1 February 1929 |
Owner | Indian Railways |
Operator(s) | Southern Railway zone |
Depot(s) | Villupuram Golden Rock |
Technical | |
Line length | 178 km (111 mi) |
Track gauge | 1,676 mm (5 ft 6 in) |
Operating speed | 80 km/h (50 mph) |
Route number | 21/21A[1] |
Chord Line, Tamil Nadu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Chord Line connects Viluppuram Jn and Tiruchirappalli Jn in Tamil Nadu. It is the vital, shortest and busiest route connecting Chennai Egmore and Southern Tamil Nadu.
Contents
History
Until 1927, Villupuram Jn and Tiruchirappalli Jn were only connected by Main line that traversed through Kumbakonam and Mayavaram, which was 240 kilometres (150 mi). Hence, the need for shorter route arose and construction began on 22 August 1927 for a new railway line via Vriddhachalam in phases. Initially, the stretch between Viluppuram and Virudhachalam were completed and opened on 1 December 1927, the Srirangam - Golden Rock stretch on 22 August 1927, Bikshandarkoil - Srirangam stretch on 12 December 1927 and the entire stretch began its operations since 1 February 1929. This line gradually reduced the Madras - Colombo journey by around four hours.[2]
Gauge conversions
Under Project Unigauge, the conversion from metre gauge to broad gauge was effected during 1992-93 and completed during September 1998.[3]
Electrification
This stretch was proposed for electrification phase by phase by CORE. The electrification was completed during 2010.[4]
Operations
Passenger services
The line experiences a heaviest traffic[5] handling about 30 passenger and 56 express trains passing through every day in addition to goods train, particularly during night.[6][7][8]
Freight services
The line has a number of Industrial establishments[9] which utilises their nearby railway stations for their logistics and transports such as Central Workshop (Golden Rock), Cement and gypsum factories at Trichy, Perambalur and Ariyalur,[10][11][12] and the Sugar factories at Villupuram and Vridhachalam,[13]
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Pages with reference errors
- Use dmy dates from January 2016
- Use Indian English from January 2016
- All Wikipedia articles written in Indian English
- Articles that mention track gauge 1676 mm
- Pages with broken file links
- Trichy railway division
- Broad gauge railway lines in India
- Railway lines opened in 1929
- Rail transport in Tiruchirappalli