Line 11, Shanghai Metro
Line 11, Shanghai Metro | |||
---|---|---|---|
|
|||
272px | |||
Overview | |||
Type | Rapid transit | ||
Status | Chenxiang Road and Yanyu Road Stations Reserved. Extension to Disneyland Resort projected to open in 2016 | ||
Locale | Shanghai, China Kunshan, Jiangsu, China |
||
Termini | Jiading North/Huaqiao Kangxin Highway |
||
Stations | 37 | ||
Daily ridership | 800,000 (2015 peak)[1] | ||
Operation | |||
Opened | December 31, 2009 | ||
Operator(s) | Shanghai No.2 Metro Operation Co., Ltd. | ||
Character | Underground Elevated (Kangxin Highway to Luoshan Road and every station since Nanxiang (whatever to North Jiading or Huaqiao)) | ||
Technical | |||
Line length | 80.6 km (50.08 mi) | ||
No. of tracks | 2 | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
Electrification | Overhead lines (1500 volts DC) | ||
Operating speed | 80 km/h (50 mph) | ||
|
Line 11, Shanghai Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Line 11 is a northwest-southeast line of the Shanghai Metro network. It has two services: Service A (the Main Line) runs between Jiading North and Luoshan Road, while Service B (the Branch Line) runs between Huaqiao and Sanlin. The two services share the same route and stations between Jiading New City and Sanlin and stop at these stations at alternate 5-minute intervals. The line is colored brown on system maps.
Service routes
Stations
Rolling Stock
Type | Time of manufacturing | Series | Sets | Assembly | Notes |
---|---|---|---|---|---|
Type A | 2008–2013 | AC16 | 72 | Tc+Mp+M+M+Mp+Tc | Manufactured by CSR Zhuzhou |
Overview
The 1st phase of Line 11, which runs from Jiading North to Jiangsu Road, opened on 31 December 2009.[2][3] A branch line from Anting opened on 29 March 2010.[4]
The 2nd phase runs from Jiangsu Road to Luoshan Road. It opened on 31 August 2013.[5]
The 3rd phase connects Luoshan Road and the proposed Shanghai Disney Resort. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015. The Disney station will open in 2016 to coincide with the opening of Shanghai Disney Resort..[6]
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.railjournal.com/altworldmarket.shtml
- ↑ [1]
- ↑ 11号线支线下周一试运营, news.163.com. Retrieved 28 March 2010.
- ↑ Metro extension to open next year
- ↑ Lua error in package.lua at line 80: module 'strict' not found.[dead link]