Kanpur Monorail
कानपूर मोनोरेल
Overview
Owner Government of Uttar Pradesh
Locale Kanpur, Uttar Pradesh
Transit type Monorail
Number of lines 3 (planned)
Daily ridership 35,000 (Estd.)
Headquarters Monorail
Operation
Train length 4 coaches
Technical
Electrification 750 V DC
Average speed 31 km/h (19 mph)
Top speed 80 km/h (50 mph)

The Kanpur Monorail is a proposed monorail system for the city of Kanpur.[1][2]

Project

Lua error in package.lua at line 80: module 'strict' not found. Promises are meant to be broken, the adage goes. And Kanpuriyas, it seems, are having a fair share of promises made and broken by politicians and bureaucrats alike.

Chief minister Mulayam Singh Yadav, while addressing entrepreneurs of UP origin from across the globe at the "UP-Calling 2004" on February 20, had announced to launch a magnetic monorail between Lucknow and Kanpur. For this purpose, the UP Development Council (UPDC) was in touch with a consortium of Japanese companies, he had added. That was the first and the last mention of the project.[3]

Lines

There are three lines proposed in phase I are as follows:[4]

Total length of Phase I would be 63.0 km.

Other lines

Other lines which are being proposed in addition to Phase I are:[5]

Status

Feasibility study has been completed for Phase I corridors. Work likely to start after 2016.[4]

References

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />

<templatestyles src="Asbox/styles.css"></templatestyles>

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. http://www.niua.org/projects/tpt/introduction.pdf
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.