Changchun Rail Transit
Overview | |||
---|---|---|---|
Locale | Changchun, Jilin, China | ||
Transit type | Rapid transit/Light rail | ||
Number of lines | 2 | ||
Number of stations | 49 | ||
Daily ridership | 140,000 (2012 Daily Avg.) 200,000 (2012 Peak)[1] |
||
Operation | |||
Began operation | 2002 | ||
Operation will start | 2016 (metro) | ||
Technical | |||
System length | 50.63 km (31.46 mi) | ||
|
Changchun Rail Transit | |||||||
Simplified Chinese | 长春轨道交通 | ||||||
---|---|---|---|---|---|---|---|
Traditional Chinese | 長春軌道交通 | ||||||
|
Changchun Rail Transit (Changchun RT) is an on-ground rail mass transit system in the city of Changchun, Jilin province, China. It is said to be the first light rail transit or metrotram system on mainland China. The initial phase of Line 3 was completed in 2001, the 2nd phase was completed in 2006. Thus the construction of Line 3 has been totally finished. It officially opened to revenue service in October 2002. The current total length of the route is 50.63 kilometers (31.46 mi) with 49 stations.[citation needed] 4 sections of 4 Lines are under construction.[2]
The system will be expanded by two lines of conventional underground metro and one line of lightrail. Construction of the first line of metro (Line 1), with 18 stations and a length of 20.12 kilometers (12.50 mi), started in 2011, and it is planned to open for service in 2016.[citation needed] Construction on a second metro line (Line 2) started in 2012.Construction on a third lightrail line (Line Beihu) started in 2014. Construction on extending Line 3 started in 2014.
Contents
Network
Line | Terminals (District) |
Opened | Newest Extension |
Length km |
Stations | |
---|---|---|---|---|---|---|
Lua error in package.lua at line 80: module 'strict' not found. | Changchun Railway Station (Kuancheng) |
Changyingshijicheng (Nanguan) |
2002 | 2006 | 31.9 | 33 |
Lua error in package.lua at line 80: module 'strict' not found. | Northern Stop of Changchun Railway Station (Kuancheng) |
Chechang (Nanguan) |
2011 | — | 18.7 | 16 |
Total | 50.63 | 49 |
Line 3
- The current alignment has 32 stations which include Changchun Railway Station, Liaoninglu, Furongqiao, Xi'anqiao, Nanchanglu, Chaoyangqiao, Jiefangqiao, Huxiqiao, Fusonglu, Nanhudalu, Huguanglu, Guigudajie, Qianjin, Qianjindajie, Weimingjie, Weiguangjie, Weixingguangchang, Yataidajie, Yitonghe, Linhejie, Xiantaidajie, Huizhanzhongxin, Shijiguangchang, Zhongyiyaodaxue, Dongbeishida, Huaqiaowaiyuan*Boxuelu, Nongboyuan, Jingyuegongyuan, Zishanlu, Fuzhilu, Huaxuechang, Changyingshijicheng.
- The first train departs at 6:00. At 21:00 both last trains leave the termini at Changyingshijicheng, Shijiguangchang and Changchun Railway Station.
- You can transfer Line 4 at Linhejie.
Line 4
- The current alignment has 15 stations which include Northern Stop of Changchun Railway Station, Beiyataidajie, Weihuanggong, Dongdaqiao, Jilindalu, Gongpinglu, Ziyoudalu, Pudonglu, Dongnanhudalu, Beihailu, Weixinglu, Shironglu, Nansanhuan, Nansihuan, Chechang.
- The first train departs at 6:00. At 21:00 both last trains leave the termini at Northern Stop of Changchun Railway Station and Chechang.
- You can transfer Line 3 at Weixinglu.
The History and Lines of the Changchun Rail Transit
Lines Serving Now
- October 30,2002: Line 3 (Phase 1) Changchun Railway Station - Weiguangjie
- December 26,2006: Line 3 (Phase 2) Weiguangjie - Changyingshijicheng
- June 30,2011: Line 4 Dongdaqiao - Chechang
- May 7,2012: Line 4 Northern Stop of Changchun Railway Station - Dongdaqiao
Lines Under Construction
- 2016: Line 1 Beihuanchenglu - Hongzuizi
- 2016: Line Beihu Beihuanchenglu - Taipingcun
- 201?: Line 3 Underground section from Furongqiao to Weihuanggong will be used. Former section overground will be dissolved.
- Before 2018: Line 2 Guojiqichenggongyuan - Dongfangguangchang
Future Projects
- 20??: Line 1 Beihuanchenglu - Lanjia
- 20??: Line 1 Hongzuizi - Yongchun
- 20??: Line 2 Dongfangguangchang - Xiangshui
- 20??: Line 4 Northern Stop of Changchun Railway Station - Hexin
- 20??: Line 5 Fufeng - Xinglongshan
- 20??: Line 6 Changchun West Railway Station - Fuzhilu
- 20??: Line 7 Bailongju - Taipingcun
- 20??: Line 8, 9 and 10
References
See also
Wikimedia Commons has media related to Changchun Light Rail Transit. |
External links
- Network map (to scale)
- Changchun Light Rail Transit Blog
- Changchun Light Rail (Chinese)
- UrbanRail Page on Changchun Light Rail
<templatestyles src="Asbox/styles.css"></templatestyles>
<templatestyles src="Asbox/styles.css"></templatestyles>
- Articles containing simplified Chinese-language text
- Articles containing traditional Chinese-language text
- Articles with unsourced statements from July 2014
- Pages using collapsible list with both background and text-align in titlestyle
- Pages with broken file links
- Commons category link is locally defined
- Articles with Chinese-language external links
- Changchun Light Rail Transit
- Transport in Changchun
- Railway lines opened in 2001
- People's Republic of China rail transport stubs
- Tram stubs