Cologne Stadtbahn

From Infogalactic: the planetary knowledge core
(Redirected from Trams in Cologne)
Jump to: navigation, search
Cologne Stadtbahn
KVB logo.svg
KVB4076 Severinsbruecke.jpg
Light rail trainset in front of the river Rhine and Cologne Cathedral
Overview
Locale Cologne (Köln)
Germany
Transit type Light rail (Stadtbahn)
Number of lines 12
Number of stations 233
Daily ridership 574,795 (2013)[1]
Annual ridership 209,800,000 (2013)[1]
Website www.kvb-koeln.de
Operation
Began operation October 11, 1968[citation needed]
Operator(s) Kölner Verkehrs-Betriebe (KVB)
Number of vehicles 382 (2013)[1]
Train length 60 meters (200 ft)
Technical
System length 194.8 kilometers (121.0 mi) (2013)[1]
Track gauge 1,435 mm (4 ft 8 12 in)
Average speed 16.2 mph (26.1 km/h) (2013)[1]

The Cologne Stadtbahn is a light rail system in the German city of Cologne, including several surrounding cities of the Cologne Bonn Region (Bergisch-Gladbach, Bonn, Bornheim, Brühl, Frechen, Hürth, Leverkusen-Schlebusch, Wesseling). The term Stadtbahn denotes a system that encompasses elements of trams as well as an underground railway network (U-Bahn) and interurban rail, even including three lines that are licensed as heavy rail and used by freight trains as well as Stadtbahn vehicles. Two of these lines connect the Cologne Stadtbahn to the Bonn Stadtbahn. These lines (16 and 18) are jointly operated by both cities' transport authorities, resulting in both systems and the lines connecting them sometimes collectively referred to as Stadtbahn Rhein-Sieg. The Cologne Stadtbahn is operated by the Kölner Verkehrsbetriebe (KVB) and the Bonn Stadtbahn is operated by the Stadtwerke Bonn (SWB - City of Bonn Utilities Division). The KVB and SWB are members of the Verkehrsverbund Rhein-Sieg (VRS - Rhein-Sieg Transit Authority), formed in 1987 to consolidate the transit authorities in the metropolitan Cologne area and operate a joint fare structure. There are 38 underground stations, 4 more are currently under construction.

History

The Cologne Stadtbahn traces its history to the first horsecar lines that started operating in 1877. Within a few years, several companies had built an extensive network. Because none of these companies showed interest in electrifying their lines, the city of Cologne bought them on 1 January 1900. Electric streetcars were introduced and additional lines built until 1912, including Vorortbahnen to surrounding villages outside the city limits. Outside the city center, these lines had separated right-of-way and were more similar to "real" railroads than to trams.[citation needed]

During World War II, Cologne suffered heavy damage. The city center was almost completely destroyed and the tram lines with it. After the war, only a few of the existing lines were rebuilt in the downtown area, while at the same time automobile traffic increased heavily. To improve the situation, construction of the first tunnel began in 1963. When the tunnel was opened in November 1968, it was integrated into the tram network, instead of a separate subway operation. Since then, street-running tram lines have gradually been replaced with tunnels, some elevated track and surface lines with separated right of way. From 1973 until 2006 light rail vehicles have operated together with classic trams on the same lines.[citation needed]

Underground construction in downtown Cologne, one of Germany's oldest cities, is often obstructed by archeologists' legal rights to dig in all future building sites within the medieval city limits before all heavy construction machinery.[citation needed]

Current routes

technical map

Because the light rail network evolved from the tram network instead of replacing it, there were numerous stations served by both light rail and tram vehicles for almost three decades. While high platforms for stepless entry into light rail vehicles could be built on the outer branches, stations in the city center had to have low platforms to support trams as well. The introduction of low-floor technology in the early 1990s promised wheelchair-accessible entry throughout the network without having to build several hundred high platforms. To allow the introduction of low-floor trains without having to demolish existing high platforms, the network was divided into two sub-networks of different floor heights.

On weekdays, all lines are served in 5- to 10-minute intervals from 6 am to 8 pm, with little or no service between around 1 am and about 4.30 am, and usually 15-minute intervals in the early night and early morning. On weekends, there is an hourly service throughout the night. Because several lines overlap on the routes through the city center, some stations are served by up to 30 trains per hour in each direction.

route length avg. speed
1 Weiden West – Junkersdorf – NeumarktBf Deutz - Kalk Post - Kalk Kapelle – Brück – Refrath - Bensberg
during peak hours 5-minute intervals Junkersdorf–Brück
24.9 km (15.5 mi) 27.2 km/h (16.9 mph)
3 Mengenich – Bocklemünd – Bickendorf - Bf EhrenfeldBf WestNeumarktBf Deutz – Buchheim – Holweide – Thielenbruch
off-peak service ends at Holweide
20.1 km (12.5 mi) 26.2 km/h (16.3 mph)
4 Bocklemünd – Bickendorf – Bf EhrenfeldBf WestNeumarktBf Deutz – Mülheim, Wiener Platz – Dünnwald - Schlebusch
evening service starts at Bickendorf
21.5 km (13.4 mi) 28.0 km/h (17.4 mph)
5 Sparkasse Am Butzweilerhof - Ossendorf – Neuehrenfeld - Bf WestDom/HbfRathaus - Heumarkt 10.3 km (6.4 mi) 20.4 km/h (12.7 mph)
7 Frechen – Marsdorf – Braunsfeld – Neumarkt – Poll - Porz – Zündorf
Frechen–Braunsfeld served in 20-minute intervals except for peak hours
25.5 km (15.8 mi) 25.5 km/h (15.8 mph)
9 Sülz – UniversitätBf SüdNeumarktBf DeutzKalk Post - Kalk Kapelle – Ostheim - Königsforst
5-minute intervals Universität–Bf Deutz except for school holidays
15.4 km (9.6 mi) 25.0 km/h (15.5 mph)
12 Merkenich – Niehl – EbertplatzHansaring – Ringe – Zollstock
Merkenich–Niehl served in 20-minute intervals from 9am to 1pm
16.5 km (10.3 mi) 22.0 km/h (13.7 mph)
13 Sülzgürtel – Aachener Str. – Bf Ehrenfeld – Gürtel – Bf Mülheim – Buchheim - Holweide 15.4 km (9.6 mi) 28.9 km/h (18.0 mph)
15 Chorweiler – Longerich – Ebertplatz – Hansaring – Ringe – Ubierring
during peak hours 5-minute intervals Longerich–Ubierring
15.2 km (9.4 mi) 24.0 km/h (14.9 mph)
16 Niehl, Sebastianstraße – Dom/HbfNeumarkt – Ubierring – Sürth – Wesseling – Bonn Hbf – Bonn-Bad-Godesberg
20-minute intervals from Sürth (during peak hours from Wesseling)
44.4 km (27.6 mi) 33.3 km/h (20.7 mph)
17

Severinstr. – Chlodwigplatz – Rodenkirchen (– Sürth)
monday to friday, 7:00 to 8:00 and 16:30 to 18:00 to Sürth

18 Thielenbruch – Buchheim – Bf MülheimDom/HbfNeumarkt – Klettenberg – Brühl – Bonn Hbf
5-minute intervals Buchheim–Klettenberg, 20-minute intervals from Brühl
46.2 km (28.7 mi) 33.4 km/h (20.8 mph)
Appellhofplatz/Breite Straße station before renovation with a train

Low-floor lines

East-West lines

East-West network

The first step towards the introduction of a low-floor light rail network was concentrating four lines on similar routes on a common east-west-corridor in 1994. Within short time, these lines were equipped with low platforms 35 cm above street level on every single station. While there are some stretches that can be described as classic tramway lines, the majority of the east-west-network has been upgraded to a high standard with long sections having separated right-of-way, justifying the term "low-floor light rail" (Niederflurstadtbahn).

In 2007, the 8 line, which previously operated during peak hours, stopped service. All its runs were integrated into the schedules of the lines 7 and 9.

 1   Weiden West (S-Bahn) – Junkersdorf – Rheinenergiestadion – Aachener Straße/Gürtel – Rudolfplatz – Neumarkt – Bf Deutz/Messe – Kalk – Brück – Refrath – Bensberg
 7   Frechen – Marsdorf – Aachener Straße/Gürtel – Rudolfplatz – Neumarkt – Poll – Porz – Zündorf
 9   Sülz – Zülpicher Straße/Gürtel – University – Zülpicher Platz – Neumarkt – Bf Deutz/Messe – Kalk – Vingst – Ostheim – Rath/Heumar – Königsforst

Ring lines

The Ring network

When it became clear to city authorities that the construction of a large number of additional high platforms was not financially feasible, other options were investigated. It was deemed most economical to create a second low-floor network and equip the remaining lines with high platforms. Between the stations "Ebertplatz" and "Barbarossaplatz", there are two possible routes. It was decided that the future low-floor lines would be concentrated in the tunnel underneath the Cologne Ring road, while high-floor lines would use the tunnel under the Central station.

This change was implemented in December 2003, after the high platforms at the Hansaring station were removed. In 2006, the tracks of the Chorweiler station were raised with additional gravel. Since then, all "Ringe" lines are operated with low-floor vehicles. In 2007, the line 6, which had only operated during peak hours, was replaced by additional trains of line 15.

 12   Merkenich – Fordwerke – Wilh.-Sollmann-Straße – Ebertplatz – Friesenplatz – Barbarossaplatz – Eifelstraße – Zollstock
 15   Chorweiler – Longerich – Wilh.-Sollmann-Straße – Ebertplatz – Friesenplatz – Barbarossaplatz – Eifelstraße – Chlodwigplatz – Ubierring

High-floor lines

high-floor sub-network

The high-floor network consists of all lines operated by "classic" light rail vehicles with a floor height of roughly one meter above street level. Since the separation from the low-Floor network. high platforms are being built in stations in the city center at a rate of one or two per year. As of 2009, the most frequented stations have been upgraded with the exception of the Barbarossaplatz station.

Lines 3 and 4, since the construction of temporary platforms at the Severinstraße station while the actual station gets modernized and connected to the North-Southern tunnel, are Cologne's first HF lines completely equipped with level entrance. The western branch of line 5 still has a two stops (Subbelrather Straße/Gürtel and Nußbaumerstraße) with low platforms, the rest of its stations were made high-floor when the line was extended into the Butzweilerhof industrial area.

Line 13 is also referred to as the "beltway" (Gürtel) line, because it is the only line that does not touch the city center. Line 13 is also referred somitimes as the Outer Ring line, while lines 12 and 15 can be referred as the inner ring line. Most of the line runs along a series of roads of the same name. The northern part of the 13 is built as an elevated railway. High-floor platforms are still very rare on this line.

Since the timetable change on 12.13.2015 a section of the north-south rail was put into operation. Since then drives the new line 17 of the Severinstr. on the Chlodwigplatz. From Chlodwigplatz it comes to stop Bonner Wall. After leaving the line 17 the NSS-Tunnel and embarks on the route of the line 16 and the next stop loud Schönhauser Str. The left 17 then moves to the terminus Rodenkirchen Bf. In the morning between 7:00 to 8:00 and 16:30 to 18:00, the line serves 17 rail stations Siegstr. and Michaelshoven up to Sürth to.

Lines 16 and 18 are the longest lines in the network, connecting Cologne to Bonn via railway lines.

 3   Mengenich – Bocklemünd – Venloer Straße/Gürtel – Hans-Böckler-Platz – Friesenplatz – Neumarkt – Severinstraße – Bf Deutz/LANxess Arena – Buchheim – Holweide – Dellbrück – Thielenbruch
 4   Bocklemünd – Venloer Straße/Gürtel – Hans-Böckler-Platz – Friesenplatz – Neumarkt – Severinstraße – Bf Deutz/LANxess Arena – Mülheim – Höhenhaus – Dünnwald – Schlebusch
 5  Sparkasse Am Butzweilerhof - IKEA Am Butzweilerhof - Alter Flughafen Butzweilerhof – Subbelrather Str./Gürtel – Hans-Böckler-Platz – Friesenplatz – Dom/Hbf (Central Station) – Rathaus – Heumarkt
 13   Sülzgürtel – Zülpicher Straße/Gürtel – Dürener Straße/Gürtel – Aachener Straße/Gürtel – Venloer Straße/Gürtel – Subbelrather Straße/Gürtel – Nußbaumer Straße – Escher Straße –Neusser Straße/Gürtel – Amsterdamer Straße/Gürtel – Slabystraße – Mülheim – Buchheim – Holweide
 16   Bonn-Bad Godesberg – Bonn Hbf (Main Station) – Wesseling – Sürth – Rodenkirchen – Ubierring – Barbarossaplatz – Neumarkt – Dom/Hbf (Central Station) – Ebertplatz – Reichensperger Platz – Niehl
17

Severinstr. – Chlodwigplatz – Rodenkirchen (– Sürth)
monday to friday, 7:00 to 8:00 and 16:30 to 18:00 to Sürth

 18   Bonn Hbf (Main Station) – Brühl – Klettenberg – Sülzgürtel – Barbarossaplatz – Neumarkt – Dom/Hbf (Central Station) – Ebertplatz – Reichensperger Platz – Slabystraße – Mülheim – Buchheim – Holweide – Dellbrück – Thielenbruch

Butzweilerhof extension (Line 5)

Stations on the extension

The Kölner Verkehrsbetriebe (KVB) has recently constructed a new 1.85 km (1.15 mi)-long extension from the former Ossendorf terminus into the Butzweilerhof/Gewerbegebiet Ossendorf area, which opened on December 2010.[2] Three new stations (Alter Flughafen Butzweilerhof, IKEA am Butzweilerhof and the new terminus, Sparkasse Am Butzweilerhof) were added to the existing Line 5. Construction of the extension cost about 18 million, with €5 million being financed through a charge on the companies which will benefit from the extension. The remaining €13 million was financed by the KVB Köln (Cologne Transit Authority).

The extension begins near the former Ossendorf terminus (which has been closed), crosses the tracks of the HGK,[3] follows the southern edge of the Hugo-Eckener-Strasse with the 1st station (Alter Flughafen Butzweilerhof) being sited at the corner of Hugo-Eckener-Strasse and Köhlstrasse. It then follows a new street which continues east from Köhlstraße. The line passes the new IKEA am Butzweilerhof store (2nd station), crosses the new extension of Richard-Byrd-Straße, and ends at the intersection of Richard-Byrd-Straße and Von-Hünefeld-Straße.

Future expansion

History

North-South line under construction

The oldest tunnel of the Cologne Stadtbahn is currently served by 30 trains per hour in each direction. Many consider this beyond the tunnel's capacity. Because the tunnel was built using a cut-and-cover technique, it follows major roads distant from the old city center with its narrow alleys. To solve both problems, an additional pair of tunnels was bored directly underneath the historic downtown areas. As a bonus, the travel time for line 16 will be decreased by about 10 minutes, because the NSS enables it to avoid the detour from Ubierring to Barbarossaplatz, only to return to the Rhine at the Central Station. It is also the final step in the separation of the high-floor and low-floor networks.

The current expansion project under construction is a new North-South tunnel (Nord-Süd-Stadtbahn, NSS). The new 3 km long tunnel will be the first newly built line since the opening of the original downtown tunnel in 1968. Every line opened in between had been just a replacement for current or previous surface lines.

Tunnel Collapse and Delays

On March 3, 2009 the building of the City's archive collapsed into a Stadtbahn's tunnel under construction on the Severinstraße, killing two people.[4] Poor construction, the theft of necessary iron reinforcements and several ground water break-ins into the tunnel, which were not reported or controlled properly by the construction company, are among the alleged causes for this catastrophe.[4][5]

In order to make use of the already completed tunnels and stations, a shorter service running from Dom/Central Station to Rathaus (city hall) started operation in December 2012,[6] re-routing line 5 from its previous terminus at Reichenspergerplatz to serve the new NSS. A further expansion to Heumarkt opened in December 2013.[6] Starting December 13, 2015, four underground stations from Bonner Wall to Severinstraße were opened.[7]

The next step of the expansion will be an above ground extension from the Marktstr. station down Bonner Straße, through Bayenthal. Construction will start Spring 2016 and should be completed sometime in 2018. [8] Full operation of the North-South Rail Tunnel will not be achieved until 2023 due to the issues of stabilizing the section of tunnel that collapsed in 2009. [9]

Cost

The extra cost of approximately 4 million euro is planned to mitigate the negative perception of the NSS project due to the collapse as well as budget increases, late completion (originally planned for 2011) and disruption. In order to avoid the possible destruction of archaeological artefacts underneath one of the oldest cities in Germany, the NSS was bored down to nearly 30 meters below ground level. At the location of the future stations however, archaeological digs were still required and are cited as one of the reasons for the already significant cost overruns. While initially estimated to cost around 600 million euro, the current price tag is calculated at around 960 million euro. Because the second stage, connecting the tunnel to the line along the Rhine river has not yet been tendered, but is expected to cost another 100 million, total cost is likely to exceed 1 billion euro.

Rolling stock

Third-generation Type B LRV in new livery on line 16
A K4000 low-floor tram in old livery on line 12
A newer K4500 tram at its presentation on 18 April 2005
Two K5000 high-floor trams on lines 3 (left) and 4 (right)

Since the last traditional tramcars were retired in 2006, the Stadtbahn's active rolling stock consists exclusively of modern articulated light rail vehicles. All of them are about 30 m (98 ft 5 in) long, 2.65 m (8 ft 8 in) wide, seat approximately 70 passengers and are approved for speeds of up to 80 km/h (50 mph). With rare exceptions, all services are operated by two units coupled together.

Stadtbahnwagen B

In 1973, Cologne received two prototypes of the DUEWAG Stadtbahnwagen B LRV. Since then, 172 units in four batches were delivered to Cologne until 1996. The first generation (series 2000) is currently being retired, while the second generation (series 2100) is due to receive a major overhaul for at least another 15 years of service.

Low-floor LRVs (K4000 and K4500)

After tests with a low-floor tram from Vienna, a similar vehicle was developed for Cologne by Bombardier Transportation, later becoming part of Bombardier's standardized Flexity Swift family. A total of 124 low-floor trams were delivered between 1995 and 1998, referred to as "K4000". These vehicles received numbers starting with 4001.

When it was decided to create a second low-floor network, an option for high-floor vehicles was changed to additional low-floor vehicles. Bombardier developed a new low-floor tram based more on the K5000 (see below) than on the K4000. These new trams were named "K4500". Delivery of 69 units started in 2005 and was completed in late 2007.

The CR4000 trams operating on Tramlink in Croydon, England are largely based on the original K4000 stock used in Cologne.

CitySprinter

By the time a new series of high-floor vehicles was needed, DUEWAG had been sold to Siemens Transportation Systems and later dissolved, meaning that additional Type B cars were no longer being made. Siemens subsequently proposed the "CitySprinter", a high-floor derivative of its Combino series of low-floor city trams.

In August 1999, after two months of testing, the first CitySprinter prototype crashed into another tram at Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). at the "Christophstraße/MediaPark" U-Bahn station. The accident was caused by a simultaneous electronics shutdown resulting in the train's inability to apply its brakes. Eight people sustained serious injuries. A second prototype was produced but as a result of the crash was never delivered.

High-floor LRVs (K5000 and K5200)

Following the failure of the CitySprinter, Bombardier derived a high-floor tram from the K4000. 59 units, named "K5000", were delivered in 2002 and 2003. The numbering was changed to 5101 at short notice to avoid re-using the number 5001, which had been the number of the ill-fated CitySprinter. Another 15 vehicles of the same design, named "K5200", were delivered before 2011.

The M5000 trams used by Metrolink in Manchester, England are almost identical to the K5000/K5200 series used in Cologne.

Tram interiors

See also

References

Inline citations

  1. 1.0 1.1 1.2 1.3 1.4 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 http://stadtbahn.relaunch.net/german/news/press.html?NID=737
  7. http://www.ksta.de/koeln/das-sind-die-neuen-haltestellen-der-kvb-linie-17-sote-23268438
  8. http://www.stadt-koeln.de/leben-in-koeln/verkehr/3-baustufe-nord-sued-stadtbahn
  9. http://www.ksta.de/koeln/koelner-stadtarchiv-wer-soll-die-u-bahn-weiterbauen--23911086

Books

German/English
  • Christoph Groneck: Köln/Bonn Stadtbahn Album, Robert Schwandl Verlag 2005, ISBN 3-936573-07-7
German
  • Dieter Höltge/ Axel Reuther: Straßen- und Stadtbahnen in Deutschland Band 7: Köln, Düren, Aachen, EK-Verlag, 2001, ISBN 3-88255-338-3
  • Doris Lindemann / Kölner Verkehrs-Betriebe (Hg): Kölner Mobilität - 125 Jahre Bahnen und Busse, Du Mont Verlag 2002, ISBN 3-8321-7177-0

External links

Lua error in package.lua at line 80: module 'strict' not found.