Taoyuan Metro

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Taoyuan Metro
Taoyuan Metro logo seal only.svg
Overview
Locale Taoyuan and New Taipei, Taiwan
Transit type Rapid transit
Number of lines 1 under construction,
5 planned
Website Taoyuan Metro Corp. (Chinese)
Operation
Operation will start 2016[citation needed]
Operator(s)
Technical
System length 186.1 km (115.6 mi) (planned total, except Taolin Line and Taipei Metro Sanying Line)
Track gauge 1,435 mm (4 ft 8 12 in) (all lines except Red Line)
1,067 mm (3 ft 6 in) (Red Line only)
Plan Map

Taoyuan MRT En.png

Taoyuan Metro
Traditional Chinese 桃園捷運
Taoyuan Mass Rapid Transit System
Traditional Chinese 桃園都會區大眾捷運系統

Taoyuan Metro (formerly Taoyuan Rail Transit and officially Taoyuan Mass Rapid Transit System) is a proposed rapid transit system for the Taoyuan City area in Taiwan.[1] The proposed network will consist of five lines. A section of Blue Line has merged into the Taiwan Taoyuan International Airport Access MRT System and is under construction, while the surplus is still in the planning phase.

Lines and stations

All lines will use standard gauge track, with the exception of the Red Line which will use 3 ft 6 in (1,067 mm) track as it will use the right-of-way of a part of the TRA Western Line. The Taolin Line segment of the Brown Line from Taoyuan to Shanbi is intended to be built as a bus rapid transit route.

Line Termini Length (km) Total
Length (km)
Status
Taoyuan Airport MRT Taipei Sanchong 4.1 53.5 Under construction
Sanchong Huanbei 47.4 Under construction
Huanbei Zhongli 2.04 Under construction
Blue Airport Terminal 2 Huanbei 17.0 25.5 Under construction
Huanbei Zhongli 2.1 Under construction
Zhongli Bade 6.4 Planning
Green Main Line Danan/Bade Kengkou/Hengshan 27.2 Planning
Daxi Line Bade Daxi 10 Planning
Zhongli Line Bade Zhongli Planning
Orange Main Line Shanzaiding Tongan Planning
Longtan Line Shanzaiding Longtan 6 Planning
Brown Taolin Line Taoyuan Shanbi 12.5 24.0 Planning
Huilong Line Taoyuan Huilong 11.5 Planning
Route map

Blue Line

Linghang Station under construction (as of July 2010).
Code Station Name Connection Location
Taoyuan MRT Blue Line
Stage 1 - Under construction
A14 Airport Terminal 3 機場第三航廈 Dayuan Taoyuan City
A14a Airport Hotel 機場旅館
A15 Dayuan 大園 Green Line
A16 Hengshan 橫山
A17 Linghang 領航
A18 THSR Taoyuan Station 高鐵桃園站 AB-Kreuz.svg Taiwan High Speed Rail Zhongli
A19 Taoyuan Sports Park 桃園體育園區
A20 Xingnan 興南
A21 Huanbei 環北
Stage 2 - Taoyuan MRT Blue Line (under construction)
A22 Yongxing Park 永興公園 Zhongli Taoyuan City
A23 Zhongli 中壢 AB-Kreuz.svg18px TRA Western Line

Construction

In March 2011, the Bureau of High Speed Rail, which oversees construction of the project, announced that the 11.4 km (7.1 mi)-long elevated structure from Dayuan Station (A15) to Xingnan Station (A20) had been completed.[2] The rest of the Taoyuan Line passed an environmental impact assessment in July 2014. Construction is expected to last from June 2015 to 2019.[3]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.

External links