Southwestern Railroad (Tennessee)
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
The Southwestern Railroad started a 5 ft (1,524 mm) gauge spur line from Sparta, Tennessee to McMinnville, Tennessee to connect with the McMinnville and Manchester Railroad. The Southwestern Railroad Company was chartered in 1851–52 to build a railroad from Danville, Kentucky to McMinnville in less than ten years. The company received several extensions to complete the road during and after the American Civil War.[1] Former Confederate general George Gibbs Dibrell served as president.[2] The company went bankrupt in 1871 having constructed only a small part of the road from McMinnville to Sparta. Nashville, Chattanooga & St. Louis Railway (NC&StL) purchased the assets.[1] In 1884, NC&StL finished the 26-mile (42 km) segment to Sparta to reach the coal mines at Bon Air, Tennessee.[3]
The track is operated today by the Caney Fork & Western Railroad (CFWR).
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
<templatestyles src="Asbox/styles.css"></templatestyles>
- ↑ 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Tngenweb.org biography of Dibrell
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Pages with reference errors
- Articles that mention track gauge 1524 mm
- Defunct Tennessee railroads
- Predecessors of the Nashville, Chattanooga and St. Louis Railway
- Railway companies established in 1852
- Railway companies disestablished in 1877
- 5 ft gauge railways in the United States
- 1852 establishments in Tennessee
- United States rail transportation stubs