STS-104
Lua error in package.lua at line 80: module 'strict' not found.
![]() Atlantis docked to the Destiny laboratory on the ISS, taken from atop the P6 truss during an EVA
|
|||||
Mission type | ISS assembly | ||||
---|---|---|---|---|---|
Operator | NASA | ||||
COSPAR ID | 2001-028A | ||||
SATCAT № | 26862 | ||||
Mission duration | 12 days, 18 hours, 36 minutes, 39 seconds | ||||
Distance travelled | 8,500,000 kilometres (5,300,000 mi) | ||||
Orbits completed | 200 | ||||
Spacecraft properties | |||||
Spacecraft | Space Shuttle Atlantis | ||||
Launch mass | 117,129 kilograms (258,225 lb) | ||||
Landing mass | 94,009 kilograms (207,254 lb) | ||||
Payload mass | 8,241 kilograms (18,168 lb) | ||||
Crew | |||||
Crew size | 5 | ||||
Members | Steven W. Lindsey Charles O. Hobaugh Michael L. Gernhardt Janet L. Kavandi James F. Reilly |
||||
EVAs | 3 | ||||
EVA duration | 16 hours, 30 minutes | ||||
Start of mission | |||||
Launch date | 12 July 2001, 09:04 | UTC||||
Launch site | Kennedy LC-39B | ||||
End of mission | |||||
Landing date | 25 July 2001, 03:38 | UTC||||
Landing site | Kennedy SLF Runway 15 | ||||
Orbital parameters | |||||
Reference system | Geocentric | ||||
Regime | Low Earth | ||||
Perigee | 372 kilometres (231 mi) | ||||
Apogee | 390 kilometres (240 mi) | ||||
Inclination | 51.6 degrees | ||||
Period | 92.2 minutes | ||||
Docking with ISS | |||||
Docking port | PMA-2 (Destiny forward) |
||||
Docking date | 14 July 2001 03:08 UTC | ||||
Undocking date | 22 July 2001 04:54 UTC | ||||
Time docked | 8 days, 1 hour, 46 minutes | ||||
![]()
|
STS-104 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. Its primary objectives were to install the Quest Joint Airlock and help perform maintenance on the International Space Station. It was successful and returned to Earth without incident, after a successful docking, equipment installation and three spacewalks.
Contents
Crew
Position | Astronaut | |
---|---|---|
Commander | Steven W. Lindsey Third spaceflight |
|
Pilot | Charles O. Hobaugh First spaceflight |
|
Mission Specialist 1 | Michael L. Gernhardt Fourth spaceflight |
|
Mission Specialist 2 | Janet L. Kavandi Third spaceflight |
|
Mission Specialist 3 | James F. Reilly Second spaceflight |
Mission highlights
The primary purpose of the flight was to deliver and install the Quest airlock. The Joint Airlock is a pressurized flight element consisting of two cylindrical chambers attached end-to-end by a connecting bulkhead and hatch. Once installed and activated, the ISS airlock became the primary path for International Space Station space walk entry and departure for U.S. spacesuits, which are known as Extravehicular Mobility Units, or EMUs. In addition, the Joint Airlock is designed to support the Russian Orlan spacesuit for EVA activity.
The Joint Airlock is 20 ft (6.1 m) long, 13 ft (4.0 m) in diameter and weighs 6.5 short tons (5.9 metric tons). It was built at the Marshall Space Flight Center (MSFC) by the Space Station Prime Contractor Boeing. The ISS-airlock has two main components: a crew airlock and an equipment airlock for storing EVA gear and EVA preflight preps. STS-104 also carries a spacelab pallet with four High Pressure Gas Assembly containers that were attached to the exterior of the airlock.
Mission Specialists Michael Gernhardt and James Reilly conducted three space walks while Space Shuttle Atlantis was docked to the International Space Station. They spent a total of 16 hours and 30 minutes outside. During the first space walk, Gernhardt and Reilly assisted in the installation of the airlock. During the second and third excursions, they focused on the external outfitting of the Quest airlock with four High Pressure Gas Tanks, handrails and other vital equipment. The third spacewalk was conducted from Quest itself.[1]
First flight of Block II SSME
STS-104 was the first shuttle mission to fly with a "Block II" SSME. Post-launch analysis indicated an anomaly occurred when the engine was shut down. The cause was determined and the mitigation approach was demonstrated on the STS-108 flight in November 2001.[2]
Space walks
- Gernhardt and Reilly – EVA 1
- EVA 1 Start: 15 July 2001 – 03:10 UTC
- EVA 1 End: 15 July 2001 – 09:09 UTC
- Duration: 5 hours, 59 minutes
- Gernhardt and Reilly – EVA 2
- EVA 2 Start: 18 July 2001 – 03:04 UTC
- EVA 2 End: 18 July 2001 – 09:33 UTC
- Duration: 6 hours, 29 minutes
- Gernhardt and Reilly – EVA 3
- EVA 3 Start: 21 July 2001 – 04:35 UTC
- EVA 3 End: 21 July 2001 – 08:37 UTC
- Duration: 4 hours, 02 minutes
Wake-up calls
NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during Apollo 15.[3] Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[3][4]
See also
- Space science
- Space shuttle
- List of space shuttle missions
- List of human spaceflights chronologically
- List of ISS spacewalks
- List of spacewalks
References
This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />