Rail transport in Denmark

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Denmark
DSB IC3.jpg
DSB IC3
Operation
National railway DSB
Infrastructure company Banedanmark
Major operators DSB
Arriva
DB Schenker Rail
Statistics
Passenger km 6.353 billion
(2007)[1]
Freight 1.779 billion tkm
(2007)[2]
System length
Total 2,667 km (1,657 mi)
(2008 data)[3]
Double track 946 km (588 mi)[3]
Electrified 640 km (400 mi)[3]
Freight only 112 km (70 mi)[3]
Track gauge
Main 1,435 mm (4 ft 8 12 in)
Electrification
25 kV 50 Hz 450 km (280 mi)[3]
1650 V DC 169 km (105 mi)[3]
750 V DC 21 km (13 mi)[3]
Features
No. stations 547[3]
Map
DK 2012 Electrification.jpg
Active lines of the Danish railway network with electrified main lines (blue) and S-train lines (red). The Copenhagen Metro is not shown.

Lua error in package.lua at line 80: module 'strict' not found. The rail transport system in Denmark consists of 2,633 km of railway lines,[4] of which only the Copenhagen S-train network and the main line Helsingør-Copenhagen-Padborg (at the German border) are electrified. Most traffic is passenger trains,[5] although there is considerable transit goods traffic between Sweden and Germany.

Maintenance work on most Danish railway lines is done by Banedanmark, a state-owned company that also allocates tracks for train operators. The majority of passenger trains are operated by DSB, with Arriva operating on some lines in Jutland. Goods transport is mainly performed by DB Schenker Rail, although other operators take care of a significant portion of the non-transit traffic.

Denmark is a member of the International Union of Railways (UIC). The UIC Country Code for Denmark is 86.

Tracks

Maximum speeds on the Danish railways, as of 2014.

Banedanmark is in charge of 2,132 km of railway lines,[5] which do not include the lines controlled by private railways. All Danish railways are 1,435 mm (4 ft 8 12 in) (standard gauge), with the exception of a few narrow gauge museum railways; 1,000 mm (3 ft 3 38 in) gauge was previously common on branch lines, with 700 mm (2 ft 3 916 in) being prevalent on industry railways, such as those for transporting sugar beets. The narrow gauge lines generally disappeared during the 1950s and 60s.

The maximum speed allowed on main lines is generally 180 km/h, with less trafficked lines usually allowing between 75 and 120 km/h;[6] the speed may be lowered in places due to the condition of the track. While wooden sleepers are used on sidings and branch lines, concrete sleepers are the norm on all main lines; the common two-block concrete sleepers are now being phased out in favour of monoblock ones.

The age of the tracks in Banedanmark's network has become increasingly problematic in later years. A 2002/03 analysis of Banestyrelsen's (now Banedanmark) network states that the average age of the track is too high, with a present average age of 24 years compared to the recommended 20 years.[7]

Electrification

General-purpose electric propulsion was adopted quite recently in Denmark; the political decision to electrify the main lines was made in 1979.[8] The first line to be electrified was Copenhagen–Elsinore, electrified in 1986, followed by the main line across Zealand, Funen and Southern Jutland in the 1980s–90s. On the main lines that are equipped with them, the overhead lines carry 25 kV AC at 50 Hz. The system is used on the main line from Sweden through Copenhagen to Fredericia, and from there to Padborg and the German border.[9] 25 kV AC at 50 Hz is better from a technological point of view.[citation needed] However, both Sweden and Germany use 15 kV at 16​23 Hz, and the multi-system class EG goods locomotive is equipped for both 25 and 15 kV.

The S-train network in Copenhagen operates at 1650 V DC, supplied from overhead lines; the Copenhagen Metro uses 750 V DC, supplied from a third rail.

Since there are heavy delays (several years) with the construction of the new diesel multiple unit IC4, many debaters argue that it is better to electrify major railways and purchase electric multiple units instead, since that is a more common product. At least the route Fredericia-Ålborg must be electrified in order to run electric passenger trains between Jutland and Copenhagen.The route between Kolding-Esbjerg is due to be to open for electric trains in 2015. The government has in 2009 decided to delay all electrification for several years until the new signal system ERTMS is introduced, since electrification earlier than that requires rebuilding of the existing signal system.[10]

In September 2013 the government reached a deal with the Danish People's Party and the Red-Green Alliance (Denmark) to use additional oil taxes to create a train fund. This train fund would be used to electrify all of the main line trains by 2025, and increase train speeds to 250 km/h for InterCity trains. This would allow for travel between the cities of Copenhagen, Odense, Esbjerg, Aarhus, and Aalborg in four hours.[11]

On May 26, Banedanmark announced a 2.8 billion DKK (€375 billion) contract to have Aarsleff-Siemens electrify 1300 km of tracks before 2026.[12]

Safety and signalling

Main lines were equipped with the ATC safety system during the 1990s, with a partial, cheaper implementation, ATC train stop, being used on some (but not all) branch lines. A different system, HKT, which was introduced in 1975 and utilises cab signalling, is used on the S-train network, although a simplified version, "forenklet HKT" (F-HKT), is used on some of the lines.[13]

Denmark has its own ATC system (ZUB 123), not compatible with other countries. It is a modification of the Swiss system. Trains crossing the border to Sweden or Germany have to have two ATC systems, and handle two electrical supply systems.

In order to replace the different and aging signal systems,[14] it has been decided to replace all current signal systems on Banedanmark's active network, except the S-train lines, with ERTMS level 2, relying entirely on cab signalling; general rollout is scheduled for 2018–21.[15] The S-train network is set to be refitted with a suitable urban rail system, possibly a CBTC system allowing driverless trains, by 2020.[15]

Connection to adjacent countries by rail

Denmark has railway connections to Sweden and Germany, both of which use the same rail gauge as in Denmark. The electric voltage is different as Sweden and Germany use 15 kV AC while Denmark uses 25 kV AC. The train protection systems are also different between all three countries. This means that locomotives must be specially modified to cross the borders, while railway wagons can freely cross the border if there is a suitable locomotive.

Connections to Sweden use the Oresund Railway across Oresund Bridge. Services include SJ's X 2000 service to Stockholm and Øresundståg commuter services to Malmö Central Station and beyond. As of 4 January 2016, all SJ service between Malmö and Copenhagen has been suspended due to a new Swedish law requiring ID checks when crossing the border. A solution is being examined to allow service to resume.[16] Øresundståg services now travel only as far as Copenhagen Airport due to border controls.[17]

There are 3 connections to Germany. The Vogelfluglinie route, carrying EuroCity and ICE services, uses the train ferry from Rødby, Denmark to Puttgarden on the island of Fehmarn, Germany, and from there proceeds via Lübeck and Hamburg to Berlin. The second connection is over land at Padborg, which carries ICE, intercity, and regional trains to Berlin via Hamburg, as well as EuroNight and CityNightLine trains to Amsterdam via Cologne, Basel via Frankfurt and Munich via Nürnberg.[18] The last crossing is overland at Tønder, Denmark and Süderlügum, Germany, which connects to Niebüll.[19] The Rødby ferry and Tønder crossing allow only diesel powered trains, while the Padborg crossing is electrified.

Since November 2014, CityNightLine does not service Denmark anymore.[20][21]

See also

Notes

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
  6. For details, see the map at "Kort over jernbanenettet - Maksimal hastighed", Banedanmark. (PDF file available.)
  7. See "Analyse af Banestyrelsens sporanlæg - resume" (p. 2), Banestyrelsen. (PDF format.)
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. For details, see the map at "Kort over jernbanenettet - Strækninger med el-drift", Banedanmark. (Includes map of the S-train network; PDF file available.)
  10. Transportminister: Glem alt om flere elektriske tog de næste 12 år
  11. http://www.cphpost.dk/national/high-speed-electric-trains-2025
  12. http://www.bane.dk/visNyhed.asp?artikelID=22316
  13. For details, see the map at "Kort over jernbanenettet - HKT togkontrol", Banedanmark. (PDF file available.)
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. 15.0 15.1 Lua error in package.lua at line 80: module 'strict' not found.
  16. https://www.sj.se/sj/jsp/polopoly.jsp?d=21415&a=177301&l=en&l=en&intcmp=1177185
  17. http://www.oresundstag.se/en/faq/info-pages/border-controls/
  18. http://web.archive.org/web/20100821152910/http://www.dsb.dk/Global/PDF/Koereplaner/International/International_Koereplan20jun_11dec_2010.pdf
  19. http://www.neg-niebuell.de/
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.

External links

  • Banedanmark
  • DSB
  • Arriva Tog
  • Railion Danmark
  • Rejseplanen - official search engine for all public transport by rail and bus in Denmark