Llanberis Lake Railway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Llanberis Lake Railway
Rheilffordd Llyn Padarn
250px
LAKE RAILWAY, LLANBERIS.jpg
The loco “Dolbadarn” pulls into the Llanberis station which was opened in June 2003.
Locale Wales
Dates of operation 1971–present
Track gauge 1 ft 11 12 in (597 mm)[1]
Length 2.5 miles (4 km)
Headquarters Llanberis
Llanberis Lake Railway
Padarn Railway
Pen-Y-Llyn
Passing loop
Cei Llydan
Gilfach Ddu
Dinorwic Quarry
Llyn Padarn
Llanberis
Carnarvonshire Railway
Snowdon Mountain Railway

The Llanberis Lake Railway (Welsh: Rheilffordd Llyn Padarn) is a 1 ft 11 12 in (597 mm) narrow gauge heritage railway that runs for 2.5 miles (4 km) along the northern shore of Llyn Padarn in north Wales in the Snowdonia National Park. The starting point is the town of Llanberis at the eastern end of the lake (Lua error in package.lua at line 80: module 'strict' not found.), with the western terminus at Pen Llyn in the Padarn Country Park (Lua error in package.lua at line 80: module 'strict' not found.). The return journey takes around 60 minutes.

History

Early proposals

The Llanberis Lake Railway runs along part of the trackbed of the defunct Padarn Railway, a 4 ft (1,219 mm) gauge line which connected the quarry with Y Felinheli (Port Dinorwic) on the Menai Strait. The Padarn Railway closed in October 1961 and was lifted between 16 May 1962 and February 1963. Following the closure of the Padarn Railway, various plans were made to open a 2 ft (610 mm) gauge tourist railway on the trackbed. The first serious attempt was made by G. Ward a local resident, who proposed a railway that would circle Llyn Padarn using the trackbeds of the British Rail Llanberis branch and the Padarn Railway. This plan would have utilized track and locomotives from the Dinorwic slate quarry, but the company did not pursue the proposal.[2]

Quarry closure and formation of the railway company

In July 1966, A. Lowry Porter of Southend-on-Sea proposed a shorter railway running from the quarry company's workshops at Gilfach Ddu near Llanberis to Penllyn, along the eastern-most three miles of Padarn Railway trackbed. Negotiations were progressing with the company, when in July 1969 the quarry closed at short notice.[2] The quarry's workshops at Gilfach Ddu were purchased by the Gwynedd County Council with the intention of creating a Country Park.[1]

The quarry's land and equipment were put up for auction, and Lowry Porter's fledgling railway company purchased three steam locomotives and one diesel locomotive for use on the planned lake railway. In June 1970 the County Council purchased the trackbed of the Padarn Railway and agreed to allow its use for the lake railway.[2]

The Ruston diesel locomotive was quickly put into service laying track. Meanwhile, the first steam locomotive, Dolbadarn, was restored to working order. The new railway was built to 1 ft 11 12 in (597 mm) narrow gauge instead of the more unusual 1 ft 10 34 in (578 mm) narrow gauge used in the quarries. This required all the rolling stock to be regauged, including the locomotives. Tracklaying progressed during 1970 using track recovered from several sources, including some originally used on the Lynton and Barnstaple Railway.[2]

New carriages were built using the chasses of bogie wagons. These initial efforts at creating passenger stock proved unsatisfactory — they had a tendency to derail due to their very rigid construction. This caused a delay in opening, and a subsequent rapid redesign of the carriages.[2]

Early years

The railway officially opened on 28 May 1971[1] but because of the need to redesign the carriage stock, the first public trains did not run until 19 July 1971.[2] By the end of the first season, more than 30,000 passengers had been carried. In the winter of 1971 the railway was extended to its current terminus at Penllyn. For the beginning of the 1972 season, a second steam locomotive Red Damsel was returned to service with a new name: Elidir. The locomotive roster was expanded that year to include Maid Marian (now operating on the Bala Lake Railway) and an 0-4-0 tank locomotive built by Jung in Germany.[2]

Llanberis extension

In June 2003 the railway was extended to the town of Llanberis, with a new station close to the start of the Snowdon Mountain Railway. The original terminus at Gilfach Ddu is now a through station serving both the National Slate Museum and the nearby Dolbadarn Castle. On the return journey from Pen Llyn, passengers may stop off at the Cei Llydan station for a picnic and a chance to enjoy the magnificent views of the Snowdonian mountains above Llanberis Pass.

Operations

The railway uses three steam locomotives (“Elidir“, “Dolbadarn” and “Thomas Bach”) all of which ran on the internal 1 ft 10 34 in (578 mm) gauge lines of the Dinorwic Quarry. There are also several diesel locomotives which are used for works trains and when the steam locomotives are unavailable for passenger trains.

When the Quarry closed down in 1969 the lakeside section of the trackbed was utilised for the current Llanberis Lake Railway, originally running from the National Slate Museum at Gilfach Ddu to Pen Llyn. Gilfach Ddu was the main engineering workshop of the Dinorwic Quarry and provided repair facilities for all of the steam locomotives of the quarry system.

Locomotives

Current locomotives

Number Name Builder Type Works number Date Notes Image
1 Elidir Hunslet 0-4-0 ST 493 1889 Built for the Dinorwic quarry; originally named Enid then later renamed Red Damsel 200px
2 Thomas Bach Hunslet 0-4-0 ST 894 1904 Built for the Dinorwic quarry; originally named Wild Aster 200px
3 Dolbadarn Hunslet 0-4-0 ST 1430 1922 Built for the Dinorwic quarry 200px
7 Topsy Ruston Hornsby 4wDM 441427 1961 Built for Bestwood Colliery
8 Twll Coed Ruston Hornsby 4wDM 268878 1952 Worked at the Lodge Hill and Upnor Railway
11 Garrett Ruston Hornsby 4wDM 198286 1939
19 Llanelli Ruston Hornsby 4wDM 451901 1961 200px

Also on site

Name Builder Type Works number Date Notes Image
Una Hunslet 0-4-0 ST 873 1905 Built for the Pen-yr-Orsedd Quarry. Now in the National Slate Museum, with which the Llanberis Lake Railway shares premises. 200px

Former locomotives

Name Builder Type Works number Date Notes Image
Maid Marian Hunslet 0-4-0 ST 822 1903 Built for the Dinorwic quarry. Based on the Llanberis Lake Railway from 1972 to 1975. Subsequently operating on the Bala Lake Railway 200px

See also

References

  • Lua error in package.lua at line 80: module 'strict' not found.
  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 Lua error in package.lua at line 80: module 'strict' not found.

External links