Line S2, BCR
Line S2, BCR | |||
---|---|---|---|
|
|||
Overview | |||
Type | Commuter rail | ||
System | BCR | ||
Status | Operational | ||
Termini | Beijing North Yanqing (Nancaiyuan) or Shacheng |
||
Stations | 9 | ||
Operation | |||
Opened | 6 August 2008 | ||
Operator(s) | Beijing Railway Bureau | ||
Technical | |||
Line length | 77.07 km | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in)[1] | ||
Operating speed | 160 km/h (maximum service speed) | ||
|
Line S2 (simplified Chinese: S2线; traditional Chinese: S2線; pinyin: S Èr Xiàn) is the first line of Beijing Suburban Railway (BCR) to begin operation.[2] The train locomotives are marked "Harmony; Great Wall Type" (Chinese: 和谐 长城号; pinyin: hé xié cháng chéng háo). Opened on August 6, 2008, it runs from the Beijing North Railway Station in Xicheng District to Badaling in Yanqing District, following the old Beijing-Zhangjiakou Railway, and provides faster, more frequent and convenient service than preexisting trains. The line is currently 82 kilometres (51 mi) in length with six stations and one branch line.
Contents
Phase I
Main
English |
Chinese |
|
|
Beijing North Railway Station | 北京北站 | Lua error in package.lua at line 80: module 'strict' not found. Lua error in package.lua at line 80: module 'strict' not found. Lua error in package.lua at line 80: module 'strict' not found. (via Xizhimen Station) |
Xicheng |
Qinghuayuan | 清华园 | Haidian | |
Qinghe | 清河 | ||
Changping | 昌平 | Changping | |
Nankou | 南口 | ||
Badaling | 八达岭 | Lua error in package.lua at line 80: module 'strict' not found. (Branch) | Yanqing |
Yanqing (Nancaiyuan) | 延庆(南菜园) | ||
Branch
English |
Chinese |
|
|
Badaling | 八达岭 | Lua error in package.lua at line 80: module 'strict' not found. (Main) | Yanqing |
Kangzhuang | 康庄 | ||
Shacheng | 沙城 | Huailai County, Zhangjiakou, Hebei |
|
Trains can reach a maximum speed of 160 kilometres per hour (99 mph). A trip from the north station to the Badaling Great Wall takes about 1 hour and 22 minutes. Seven other stations including Dongyuan (东园) are being renovated for this line.[3] There are regular departures throughout the day from Beijing North, with an average of one train per hour during operating hours.[4] A one-way ticket costs ¥6. Tickets can be purchased from ticket offices of stations along route on the day of travel only. The Beijing Transit card is accepted on this route.[5] Train identification numbers are prefixed with the letter 'S'. The line primarily serves tourists traveling to the Great Wall of China at Badaling.
The S2 line uses the NDJ3 locomotive marked Hexie Changcheng Hao in a nine-car push-pull configuration (L+7T+L). Accommodation comes in 'soft-seat' class only with a 2+2 (first class) or 3+2 (second class) layout. The seats were reversible, but that feature has been removed. Between Nankou and Badaling stations, the train makes a reversal at a switch-back junction. Although all stations are equipped with high-level platforms, trains are equipped with retractable steps and can also serve low-level platforms. On-board facilities include air-conditioning and heating, toilets, hot-water dispensers and a cafe-bar selling tea, coffee, soft drinks, beer and snacks. Smoking is not permitted on the train.
Notes
- ↑ Lua error in package.lua at line 80: module 'strict' not found.http://www.lrta.org/world/worlda-e.html#CN
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.[dead link]
- ↑ Lua error in package.lua at line 80: module 'strict' not found.[dead link]
- Articles with dead external links from May 2014
- Articles containing simplified Chinese-language text
- Articles that mention track gauge 1435 mm
- Articles containing traditional Chinese-language text
- Railway lines in China
- Rail transport in Beijing
- Railway lines opened in 2008
- Standard gauge railways in China