Karcham Wangtoo Hydroelectric Plant

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Karcham Wangtoo Dam
File:Damsite of Karcham Wangtoo Project at Karcham, Kinnaur.jpg
Karcham Wangtoo Hydroelectric Plant is located in India
Karcham Wangtoo Hydroelectric Plant
Location of Karcham Wangtoo Dam in India
Official name Karcham Wangtoo Hydroelectric Plant
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Purpose Power
Status Operational
Construction began 2005
Opening date 2011
Construction cost Rs. 7,150 crore ($687 million USD 2011)
Owner(s) JSW Group
Dam and spillways
Type of dam Gravity dam
Impounds Sutlej River
Height 98 m (322 ft)
Length 177.8 m (583 ft)
Elevation at crest 1,813 m (5,948 ft)
Reservoir
Surface area 588 m2 (0 acres)
Normal elevation 1,810 m (5,938 ft)
Power station
Commission date 2011
Hydraulic head 298 m (978 ft) (gross)
Turbines 4 x 250 MW Francis-type
Installed capacity 1,000 MW
Annual generation 4,560 GWh est.[1]

The Karcham Wangtoo Hydroelectric Plant is a 1,200 megawatts (1,600,000 hp)[2] run-of-the-river hydroelectric power station on the Sutlej River in Kinnaur district of Himachal Pradesh, India. The dam and power station are located between the villages of Karcham and Wangtoo where the plant also gains its name. Jaypee Karcham Hydro Corporation Limited of Jaypee Group signed a memorandum of understanding to develop the dam in 1993 and after years of delays, construction on the power station began on 18 November 2005.[3] In 2015 Jaypee Group sold out Karcham Wangtoo Project to JSW Group[4]..The first generator was commissioned in May 2011, the second in June and the final two in September.[5] The 98 m (322 ft) tall dam at Karcham (Lua error in package.lua at line 80: module 'strict' not found.) diverts a substantial portion of the Sutlej into a 10.48 m (34.4 ft) diameter and 17.2 km (10.7 mi) long headrace tunnel to the underground power station downstream at Wangtoo. At the station, the water powers four 250 MW Francis turbine-generators before it is sent back into the Sutlej via a 1.2 km (0.75 mi) long tailrace tunnel. The difference in elevation between the dam and the power station affords a gross hydraulic head of 298 m (978 ft). Water not diverted by the dam is sent over the spillway and down the normal course of the river. The main spillway is along the crest of the dam and is controlled by six radial gates.[6] Just upstream of the dam is the 300 MW Baspa II Hydroelectric Plant and downstream of the Karcham Wangtoo is the 1,500 MW Nathpa Jhakri Dam.[3]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.