Greater Cochin Development Authority

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
GCDA
The planning and development authority of the Metropolitan area of Cochin
Headquarters Kadavanthra, Kochi, Kerala, India
Area served
Kochi, Kerala
Key people
N Venugopal( Chairman,GCDA)
Website gcda.kerala.gov.in

Greater Cochin Development Authority (GCDA) is the statutory body overseeing the development of the City of Kochi in the state of Kerala, India. Technically, GCDA oversees the development of the major part of Greater Cochin area which consists of the Cochin Corporation, 9[1] surrounding municipalities (Thrippunithura, Thrikkakara, Aluva, Kalamassery, Maradu, Eloor, North Paravur, Angamaly, and Perumbavoor) and 25[1] intervening panchayats ((Chellanam, Kumbalanghy, Cheranelloor, Varappuzha, Chennamangalam, Kadamakkudy, Kadungalloor, Alengad, Chengamanad, Nedumbassery, Chottanikkara, Choornikkara, Edathala, Kumbalam, Kottuvally and others) covering an area of 632 km2.[1] This has a population of 2,589,038 (2001 census).[2] GCDA is one of the two development authorities in Kochi, the other being GIDA which oversees development in the islands towards west of the Kochi mainland, and north of the harbour, covering a total area of 100 km2.

GCDA was the first exclusive agency formed for the development of any urban area in the state of Kerala. This led to the formation of development authorities for other cities in the state. The first of these were TRIDA – the Trivandrum Development Authority. Later development authorities were formed for Kozhikode and Thrissur as well.

Projects

Kochi Marine Drive

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Kochi Marine Drive Day View
The beauty in the night, Marine Drive, Kochi
File:Kochi India.jpg
The Marine Drive
Marine Walkway
File:Marine Drive Kochi.jpg
The China-Net bridge

The Marine Drive is one of the most significant projects that GCDA has ever undertaken. The whole of the present Kochi Marine Drive (part of the Kochi Lake, west of the Shanmugham Road to the present Walkway) was claimed from the Kochi Lake in the 1980s. This land later became home for a line of high-rises namely, the GateWay Residency Hotel, the Bay Pride Mall, Kerala Trade Centre etc. A common code for construction is enforced in this stretch of land which includes that the building could be of a maximum 13 storeys, the eastern and western boundaries of the buildings should coincide etc. The sub projects of the Kochi Marine Drive include:

    • The Marine Walkway stretching from Subhas Chandra Bose Park in the south, to KSINC Boat Jetty in the north.
    • The Rainbow Bridge which is part of the Marine Walkway
    • The China Net Bridge which is part of the Marine Walkway
    • GCDA Shopping Complex in Marine Drive.
    • The Asoka-Tharangini Apartments

Jawaharlal Nehru International Stadium

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Jawaharlal Nehru Stadium

The largest stadium in Kerala with a seating capacity of 75000, and costed 75 Crore. The stadium was constructed in 515 days under the leadership of V.J.Thomas IPS, Ex-Chairman, Greater Cochin Development Authority.

Other projects

Infrastructure[3]

The first B.O.T. project in Kerala, the Mattancherry Bridge was coordinated by GCDA. In addition, Kathrikadavu Railway Overbridge and Chilavannur Bund road bridge in Chilavannur puzha have been constructed by GCDA.

In road transport sector, apart from the roads developed as part of area development schemes, in Panampilly Nagar, Gandhi Nagar,Aluva, Rameswaram,Parur etc., G.C.D.A has recently completed the 3.2 km. long and 22 mtr. wide Kaloor- Kadavanthra road, 15 mtr. wide Subhash Chandra Bose Road, Chilavannur Bund Road( partially completed) and K.P.Vallon Road widening first phase, Panampilly Nagar Anamthuruthy road (partially completed) were taken up by G.C.D.A. Land has been made available to the corporation for the construction of 2 km long & 22 mtr wide Stadium Link Road, by GCDA by negotiation with the land owners. G.C.D.A. had taken a major role in the implementation of the 22m. wide & 3 km long Sahodaran Ayyappan Road by getting land surrendered free of cost with the cooperation of Cochin Corporation.

Widening of Kaloor Palarivattom Road was taken up by State P.W.D. with the co-operation of GCDA in getting the land surrendered free of cost for road widening.

To decongest the south Railway Overbridge and to reduce traffic on M.G. Road and Chittoor road the eastern entry to the South Railway station was developed by GCDA. Greater Cochin Development Authority has thus developed a total of about 75 km. of road length of varying widths ranging from 7m to 36m with in the Greater Cochin Region.

Housing Sector[4]

  • Constructed about 5000 Nos. of dwelling units for different income group within the Greater Cochin Region.
  • Housing Loan given to about 15000 families scattered all over the Region.
  • 700 Houses constructed and allotted to low income families for rehabilitation.
  • 1700 Nos. of residential plots developed and sold to individuals.135 Acres of land given to different Government / quasi-Government agencies for group housing.

GCDA have developed many planned housing colonies such as Panampilly Nagar, Gandhi Nagar, Kasthurba Nagar, Shastri Nagar, Indira Nagar and Subash Nagar

Controversies

The Indian railways was hesitant to run and use the GCDA owned Building at Platform 6 at Ernakulam junction railway station. it is believed to be the reason behind the delay of employing the platform 6 for services. Also the parking area was run by GCDA and the fare differed with the parking area at platform 1.

See also

References

External links