Grahamstown Dam

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Grahamstown Dam
Grahamstown Dam is located in New South Wales
Grahamstown Dam
Location of the Grahamstown Dam in
New South Wales
Country Australia
Location Ferodale, New South Wales
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Purpose Water supply
Status Operational
Construction began 1955
Opening date 1969
Owner(s) Hunter Water Corporation
Dam and spillways
Type of dam Embankment dam
Impounds Off-stream
Height 12 metres (39 ft)
Length 4.8 km (3 mi)
Dam volume 2,124 m3 (75,008 cu ft)
Spillways 1
Spillway type Controlled labyrinth spillway and baffle chute
Spillway capacity 800 cubic metres per second (28,000 cu ft/s)
Reservoir
Creates Grahamstown Lake
Total capacity 190,000 megalitres (6,700×10^6 cu ft)
Catchment area 97 km2 (37 sq mi)
Surface area 2,460 ha (6,079 acres)
Website
Grahamstown Dam at hunterwater.com.au

Grahamstown Dam is a major off-stream earthfill Embankment dam with a controlled labyrinth spillway and baffle chute that stores water from the Williams River. The dam is located north of Newcastle and within the Port Stephens Council local government area in the Lower Hunter Region of New South Wales, Australia. The dam's main purpose is water supply; it provides about 40 per cent of the potable water for the Hunter region; and is the Hunter's largest drinking water supply dam.

The impounded reservoir is called the Grahamstown Lake, the Grahamstown Swamp, or the Grahamstown Storage Reservoir.

Location and features

Grahamstown Dam is immediately adjacent to residential areas in the town of Raymond Terrace, less than 4 km (2.5 mi) from the Raymond Terrace CBD. Commenced in 1955, completed in 1965, and commissioned in 1969, Grahamstown Dam is a major dam that receives its main inflow from the Williams River as well as its own catchment. Water flows into the Grahamstown Dam via the Seaham Weir, that limits the inflow of tidal seawater; Balickera Canal and pumping station, which are used to transfer water from the Williams River to Grahamstown Dam; Campvale Pumping Station; George Schroder Pumping Station and delivery mains, which are used to deliver water from the dam to the water treatment plant; and Grahamstown Water Treatment Plant.[1]

The storage was formed by building an embankment across the outlet of a natural depression known as the Grahamstown Moors. Construction began in 1955, and although all the elements of the entire scheme were not completed until 1965, water was first supplied in 1960 during the severe drought from 1960 to 1963.[1] The dam was built by the NSW Water Conservation and Irrigation Commission on behalf of the Hunter Water Corporation to supply water to the Hunter Region.[2]

The dam wall consists of 2,124 cubic metres (75,000 cu ft) of earthfill with an internal earth core. It is 12 m (39 ft) high and 4.8 km (3 mi) long. At 100% capacity the dam wall holds back 190,000 megalitres (6,700×10^6 cu ft) of water.[3] The surface area of Grahamstown Lake is 2,460 ha (6,079 acres) and the catchment area is a relatively small 97 km2 (37 sq mi). The controlled labyrinth spillway is capable of discharging 800 cubic metres per second (28,000 cu ft/s).[2]

Upgrade of facilities

Since the dam was completed, major modifications include:[1]

  • 1973: a bentonite clay core 2.02 km (1.3 mi) in length was installed in the central section of the embankment to provide a watertight seal, the 1.5 m (5 ft) thick core has an average depth of 21.3 m (70 ft);
  • 1985: the Full Supply Level of the dam was reduced from 11.1 m (36.4 ft) to 10.6 m (34.8 ft) as a temporary measure to reduce the risk of damage to the main embankment from major flooding;
  • 1994: further work was undertaken to raise the level of the clay core to road level over the full length of the embankment and rock armouring of the main embankment was also undertaken; and
  • 2005: the Full Supply Level was increased to 12.8 m (42 ft) and provided 50 per cent more storage capacity by constructing a spillway northeast of Raymond Terrace and a discharge channel under the Pacific Highway.[3]

Criticism

At the time of the proposal for the construction of a dam at Tillegra, it was claimed that Hunter Water Corporation deliberately allowed the water storage levels in Grahamstown Dam run down in order to inflate the case for the A$477 million Tillegra project.[4]

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.

External links

  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.