Chilahati railway station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Chilahati
Bangladesh Railway Station
Chilahati railway station (1).jpg
Location Nilphamari, Rangpur
 Bangladesh
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Elevation 48 m (157 ft)
Line(s) Chilahati-Parbatipur-Santahar-Darshana Line
Construction
Structure type Standard (on ground station)
Other information
Status Functioning
History
Opened 1876
Previous names Eastern Bengal Railway

Template:New Jalpaiguri–Haldibari–Parbatipur line

Chilahati (Bengali: চিলাহাটি) is a border railway station in Bangladesh, situated in Nilphamari District, in Rangpur Division. It is a defunct railway transit point on the Bangladesh-India border.

Important track in the British period

During the British period all connections from southern parts of Bengal to North Bengal were through the eastern part of Bengal. From 1878, the railway route from Kolkata, then called Calcutta, was in two laps. The first lap was a 185 km journey along the Eastern Bengal State Railway from Calcutta Station (later renamed Sealdah) to Damookdeah Ghat on the southern bank of the Padma River, then across the river in a ferry and the second lap of the journey. A 336 km metre gauge line of the North Bengal Railway linked Saraghat on the northern bank of the Padma to Siliguri.[1]

Chilahati railway station platform

The 1.8 km long Hardinge Bridge across the Padma came up in 1912. In 1926 the metre-gauge section north of the bridge was converted to broad gauge, and so the entire Calcutta - Siliguri route became broad-gauge.[1] The route thus ran: Sealdah-Ranaghat-Bheramara-Hardinge Bridge-Iswardi-Santahar-Hili-Parabtipur-Nilphamari-Haldibari-Jalpaiguri-Siliguri.

With the partition of India, this track got trisected. The through route was formally closed after the India-Pakistan War in 1965.[2]

Haldibari-Chilahati

There are proposals to reoperationalise the Haldibari-Chilahati section. Bangladesh Railway will have to construct 7.5 kilometres of new rail tracks from Chilahati to reach the border while the Indian authorities have to set up 4.5 kilometres of tracks from its border to Haldibari railway station.[2]

In the Joint Statement issued on the occasion of the visit of the Prime Minister of India to Bangladesh, on 7 September 2011, it was stated: "Bangladesh Prime Minister expressed her appreciation to the Indian Prime Minister for amendment of the MoU between the Bangladesh and Indian Railways allowing Rohanpur-Singabad as an additional route for both bulk and container cargo for Nepalese rail transit traffic. Bangladesh side also appreciated the assistance from India for the movement of fertilizers from Bangladesh to Nepal by rail route. They also agreed to re-establish rail connections between Chilahati-Haldibari and Kulaura-Mahishashan in the spirit of encouraging revival of old linkages and transport routes between the two countries."[3]

Saidpur-Chilahati railway line

As of 2010, the 64 kilometres (40 mi) long Saidpur-Chilahati line was in such a bad shape that there was no fast train between Dhaka and Chilahati. In 2010, Taka 103.68 crore was sanctioned for the development of this line.[4]

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.