Cebu–Cordova Link Expressway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Cebu–Cordova Link Expressway
300px
Render of the Cebu–Cordova Link Expressway
Crosses Mactan Channel
Locale Metro Cebu
Official name Cebu–Cordova Link Expressway
Other name(s) Cebu–Cordova Bridge
Sto. Niño Bridge[1]
Owner Cebu-Cordova Link Expressway Corporation, a subsidiary of Metro Pacific Tollways Corporation
Maintained by Cebu-Cordova Link Expressway Corporation
Website cclex.com.ph
Characteristics
Design Cable-stayed bridge
Total length 8,500 m (27,887 ft)
Width 27 m (89 ft)
Height 145 m (476 ft)
Traversable? Yes
Longest span 390 m (1,280 ft)
Clearance below 51 m (167 ft)
History
Architect Dissing+Weitling Architecture - Conceptual Design
Designer SENER Ingenieria y Sistemas & Carlos Fernandez Casado (SENER-CFC JV)
Engineering design by SENER Ingenieria y Sistemas & Carlos Fernandez Casado (SENER-CFC JV)
Constructed by Cebu Link Joint Venture (ACCIONA-FB-DMCI JV)
Construction cost ₱25 billion
Opening 2021
Statistics
Daily traffic at least 40,000 (projected)
Toll Yes

The Cebu–Cordova Link Expressway (CCLEX), also known as the Cebu–Cordova Bridge is a toll bridge expressway under-construction in Metro Cebu, Philippines which will link Cebu City and Cordova.

History

PLLO Secretary Adelino Sitoy conceptualized of plans of a bridge connecting Cebu City to the town of Cordova, along with another bridge connecting Cebu City to the town of Jetafe, Bohol, since 2014.[2] The construction of the bridge was lobbied by then chairman of the Regional Development Council of Region VII, Michael Rama who was the Mayor of Cebu City at the time the Cebu–Cordova Bridge project was already awarded to a company.[3]

In January 2016, the Metro Pacific Tollways Development Corp. (MPTDC), through a disclosure to the Philippine Stock Exchange, announced that the construction of the bridge was to commence in 2017. The company in the same announcement said that they will be responsible for the construction and financing of the bridge, as well as its operation once its completed.[3]

The groundbreaking ceremony for the Cebu–Cordova Bridge was held on March 2, 2017. President Rodrigo Duterte joined the MPTDC and local officials for the event. The bridge was the first venture of the MPTDC outside of Luzon.[4]

The bridge is planned to be opened by 2021.[5]

Operation

The CCLEX will be managed by the Metro Pacific Tollways Development Corp.[3]

Design

File:Cebu-Cordova Link Expressway future site aerial view.jpg
Site where the Cebu-Cordova Link Expressway will be built.

The bridge will span 8 kilometers (5.0 mi) and will be the longest and tallest bridge in the Philippines, surpassing the San Juanico Bridge in Leyte and Samar. It is to be designed by the Spanish firms Carlos Fernandez Casado (CFC) and SENER Ingeniería y Sistemas, while the local firm DCCD Engineering Corp and the Danish firm COWI will be the owner's Engineer. The bridge is being built by a joint venture between Spanish firm ACCIONA, and Philippine firms FB and DMCI Connecting Cebu City and Cordova, the 27-meter-wide (89 ft) bridge is meant to serve an alternate route serving the Mactan Cebu International Airport, serving at least 40,000 vehicles daily.[5]

The 390-meter-long (1,280 ft) main span of the CCLEX will be cable-stayed and will be supported by 145-meter-high (476 ft) twin tower pylons. The design of the pylons was inspired from the historic Magellan's Cross. The main span will have a 51 meters (167 ft)[6] navigation clearance, which allow ships to traverse the bridge. Viaduct approach bridges and a causeway will also form part of the CCLEX, as well as toll road facilities on an artificial island. The toll facilities' design are inspired from the eight-rayed sun of the Philippine flag.[5]

References

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />
  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Sunstar Cebu, "Review on 3rd bridge almost done", October 20, 2014
  3. 3.0 3.1 3.2 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 5.2 Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.