Agusan Dam
From Infogalactic: the planetary knowledge core
Agusan Hydroelectric Plant | |
---|---|
Location of Agusan Hydroelectric Plant in Philippines
|
|
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Construction began | May 1956 |
Opening date | December 29, 1957 |
Construction cost | $ 20.74 Million or 891.82 Million pesos (at current price) |
Owner(s) | National Power Corporation |
Dam and spillways | |
Type of dam | Concrete Flow |
Impounds | Agusan River |
Height | 1 m |
Length | 22 m |
Spillway type | Trapezoid, Overflow Type |
Reservoir | |
Total capacity | 2,996 million cubic meters |
Surface area | 117 km² |
Max. water depth | 193 meters |
Power station | |
Turbines | 2 units Horizontal Shaft, Waterwheel |
Installed capacity | 1.6 MW |
Annual generation | 10,500,000 kWh |
The Agusan Hydroelectric Plant, the downstream facility of two proposed plants, was constructed in Damilag, Manolo, Fortich, and Bukidnon[1] to serve the immediate domestic and industrial requirements of the area.[2] The watershed is small, and covers an area of around 25 km2 at the diversion dam.[3] The run-of-river plant consists of two 800-kW turbine generators that use water from the Agusan River to generate electricity. It is connected to the local distribution grid Cepalco through the Transco distribution line.[4]
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.firstgen.com.ph/PowerIndustry.php?id=57
- ↑ http://www.nwin.nwrb.gov.ph/Prog&Proj/JICA/projects/water_resources/content/14agusan_hydro.htm
- ↑ Lua error in package.lua at line 80: module 'strict' not found.