South German natural gas pipeline

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
South German natural gas pipeline
Location
Country Germany
General direction east-west
From Burghausen
To Lampertheim
General information
Type natural gas
Partners E.ON, Wingas
Operator SEL Süddeutsche Erdgasleitung
Commissioned canceled
Technical information
Length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).

South German natural gas pipeline (German: Süddeutsche Erdgasleitung (SEL)) was a planned 500-kilometre (310 mi) long German natural gas pipeline with a diameter of 1200 mm, which was planned to run from Burghausen on the German-Austrian border to Lampertheim, state of Hesse. The pipeline was to be constructed jointly by E.ON Ruhrgas and Wingas, a joint venture of Wintershall, subsidiary of BASF, and Russian Gazprom. The project was expected to cost €600 million ($759.2 million). Project was stopped in November 2008, mainly due to difficulties in financing. According to Wingas, the pipeline project was not economically sustainable; hence the halt of operations.[1]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.[dead link]