NetPoint
Lua error in Module:Infobox at line 314: malformed pattern (missing ']').
NetPoint is a graphically-oriented project planning and scheduling software application first released for commercial use in 2009. NetPoint's headquarters are located in Chicago, Illinois. The application uses a time-scaled activity network diagram to facilitate interactive project planning and collaboration. NetPoint provides planning, scheduling, resource management, and other project controls functions.[1]
NetPoint is capable of calculating schedules using both the Critical Path Method (CPM)[2] as well as the Graphical Path Method (GPM).[1]
Schedules created in NetPoint can be exported for use in Primavera, Microsoft Project, and other CPM-based Project management software.
See also
- Project planning
- Project management
- Project management software
- Comparison of project management software
- Schedule (project management)
- Critical path method
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
- Gilbane: Interactive Scheduling
- Mosaic: List of Scheduling Tools
- CPM in Construction Management: List of CPM Software
- ↑ 1.0 1.1 Mubarak, Saleh (2010). Construction Project Scheduling and Control, Second Edition. John Wiley and Sons. ISBN 978-0-470-50533-5.
- ↑ O'Brien, James J.; Plotnick, Fredric L. (2010). CPM in Construction Management, Seventh Edition. McGraw Hill. ISBN 978-0-07-163664-3.