Line 2, Hangzhou Metro

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Line 2, Hangzhou Metro
Line 2
2号线
33x33px
File:People Square Station, 2014-11-24, 21.jpg
Overview
Type Rapid transit
System Hangzhou Metro
Status Operating
Locale Hangzhou, Zhejiang, China
Termini Qianjiang Road
Chaoyang
Stations 13
Daily ridership 81,900 (2015 peak)[1]
Operation
Opened November 24, 2014[2]
Owner Hangzhou
Operator(s) Hangzhou Metro Corporation
MTR Corporation (Hangzhou)
Character Underground
Elevated
Technical
Line length 18.3 km (11.37 mi)
No. of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě ÈrHào Xiàn) a rapid transit line under construction in Hangzhou.[3][4] Its construction started in 2008,[5] and it is finished in 2016.[4][5]

Stations

Station Name
English
Station Name
Hanzi
Transfer
Location
Qianjiang Road 钱江路 Lua error in package.lua at line 80: module 'strict' not found. Jianggan
Qianjiang Century City 钱江世纪城 Xiaoshan
Yingfeng Road 盈丰路
Feihong Road 飞虹路
Zhenning Road 振宁路
Jianshe Third Road 建设三路
Jianshe First Road 建设一路
People Square 人民广场
Hangzhou Power Plant 杭发厂
Renmin Road 人民路
Panshui 潘水
Caojiaqiao 曹家桥
Chaoyang 朝阳

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.[dead link]