Flamanville Nuclear Power Plant
Lua error in Module:Infobox at line 235: malformed pattern (missing ']'). The Flamanville Nuclear Power Plant is located at Flamanville, Manche, France on the Cotentin Peninsula.
It houses two pressurized water reactors (PWRs) that produce 1.3 GWe each and came into service in 1986 and 1987, respectively. It produced 18.9 TWh in 2005, which amounted to 4% of the electricity production in France. In 2006 this figure was about 3.3%.
<templatestyles src="Stack/styles.css"/>
In 2006, before the start of construction of unit 3, there were 671 workers regularly working at the two operational reactors.
The safety of the Flamanville plant has been questioned due to the danger of flooding of the kind experienced during the 1999 Blayais Nuclear Power Plant flood.[1]
Unit 3
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
Construction on a new reactor, Flamanville 3, began on 4 December 2007.[2] The new unit is an Areva European Pressurized Reactor type and is planned to have a nameplate capacity of 1,650 MWe.
EDF has previously said France's first EPR would cost €3.3 billion[2] and start commercial operations in 2012, after construction lasting 54 months.[3]
On 3 December 2012 EDF announced that the estimated costs have escalated to €8.5 billion ($11 billion), and the completion of construction is delayed to 2016.[4] The next day the Italian power company Enel announced it was relinquishing its 12.5% stake in the project, and 5 future EPRs, so would be reimbursed its project stake of €613 million plus interest.[5][6]
In November 2014 EDF announced that completion of construction was delayed to 2017 due to delays in component delivery by Areva.[7]
In April 2015 Areva informed the French nuclear regulator, Autorité de sûreté nucléaire (ASN), that anomalies had been detected in the reactor vessel steel, causing "lower than expected mechanical toughness values". Further tests are underway.[8][9] Segolene Royal, Minister of Ecology, Sustainable Development and Energy in the Second Valls Government, has asked the producer for further details and possible consequences.[10]
In June 2015 multiple faults in cooling system safety valves were discovered by ASN.[11]
In September 2015 EDF announced that the estimated costs had escalated to €10.5 billion, and the start-up of the reactor was delayed to the fourth quarter of 2018.[12]
References
![]() |
Wikimedia Commons has media related to Flamanville nuclear power plant. |
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
- ↑ The great lesson France has to learn from Fukushima Deciphering Fukushima, published 2011-03-08, accessed 2012-05-08
- ↑ 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ www.asn.fr: Anomalies de fabrication de la cuve de l’EPR de Flamanville. Communiqué de presse, 7 april 2015
- ↑ 8. April 2015: Nucléaire: une nouvelle anomalie détectée sur l’EPR de Flamanville
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ https://www.edf.fr/en/edf/press_release/Flamanville-EPR-optimised-project-management-and-a-new-timetable
- Pages with reference errors
- Pages with broken file links
- Commons category link is locally defined
- Articles with French-language external links
- Nuclear power stations in France
- Nuclear power stations with reactors under construction
- Nuclear power stations using EPR reactors
- Buildings and structures in Manche