El Reno High School

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
El Reno High School
Address
405 S. Choctaw
El Reno, Oklahoma
United States
Information
Established 1911 (1911)
School district El Reno Public Schools
Principal Matt Goucher
Faculty 45
Grades 10-12
Enrollment 800
Color(s) navy blue and white
Athletics El Reno Indians
Mascot Indians
Website
El Reno High School
File:ElRenoHighSchool.jpg
El Reno High School is located in Oklahoma
El Reno High School
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Architect Layton, Solomon and Smith, S. Wemyss
Architectural style Late Gothic Revival
NRHP Reference # 00000179[1]
Added to NRHP March 30, 2000

El Reno High School is the only high school in El Reno, Oklahoma.

Architectural history

El Reno High School, located at 407 South Choctaw, is a ​2 12-story horizontally massed, detached building (two stories over raised basement). Measuring 175 feet east-west and 132 feet north-south, the building is oriented in an east-west direction, with the main (1911) entrance facing west on South Choctaw. The school is located in a mixed-use area, with residential areas to the west and southwest, and commercial areas to the north and east.

The building was constructed in two phases. The west half, or El Reno High School proper, constructed in 1911, was designed by the Oklahoma City firm of Layton and Smith, Oklahoma's premier architects and designers of the Oklahoma State Capitol as well as many public schools. The east half, originally built for junior high school classes, was designed by an unknown architect and was constructed in 1925-1926.

In style, the El Reno High School building incorporates many of the elements of Late Gothic Revival as applied to public buildings, also known as Collegiate Gothic.[2] The major features of this building include: flat roof with raised, shaped, and/or castellated parapet; towers with long, narrow "princess" windows; pinnacles rising from parapets or towers; and polychrome surfaces, or contrasting brick and stone work, with stone work forming copings, window and door hoods, arches, horizontal bands or water tables, and quoins. In general the two defining characteristics of the building were the decorative stonework and, before alteration, the windows. Bedford Indiana Limestone creates hood moldings that accentuate the openings and bands that emphasize the horizontal massing.

Athletics

Notable achievements

  • Basketball State Champions in 1921, 1924, 1926, 1932, 1933, 1946, 1949, and 1953. Runners up in 1920, 1930, 1935, 1936, 1959, 1998, and 2011
  • Golf State Champions in 1987 and runners up in 1997
  • Baseball State Champions in 1967, 1991 and 1992
  • Wrestling Dual State Champions from 1996, 1997, 1998, 1999, 2000, 2001, 2002, 2003, 2004, and 2005 and State Champions from 1996, 1997, 1998, 1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, and 2010. Dual State runners up in 1995
  • Runners up in Oklahoma State Football Championship in 1956, 1957, 1967, 1981, 1999

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. http://www.ocgi.okstate.edu/shpo/shpopic.asp?id=00000179