South Western Railway, Western Australia
South Western Railway | |
---|---|
File:Bunbury Bridge East Perth c.1930.jpg
Bunbury Bridge in 1930
|
|
Overview | |
Termini | Perth Bunbury |
Operation | |
Opened | 22 May 1893 (Perth-Pinjarra) 22 August 1893 (Pinjarra-Bunbury) |
Owner | Public Transport Authority |
Operator(s) | Brookfield Rail |
Technical | |
Track gauge | 1,067 mm (3 ft 6 in) |
The South Western Railway is the main railway route between Perth and Bunbury in Western Australia opening in 1893.
History
South Western Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The South Western Railway was constructed for the Western Australian Government Railways by various private contractors from 1891.[1] Among these was the engineer and magistrate William W. L. Owen.[2]
Construction was completed in two parts.[3] The first, East Perth to Pinjarra, was undertaken by William Atkins (former mill manager of the Neil McNeil Co. at the Jarrahdale Timber Station[4] and Robert Oswald Law (who built the Fremantle Long Jetty) from the end of 1891.[1] Work began in 1892 but was slowed by difficulties with building the bridge over the Swan River.[1][5] This section opened on 22 May 1893.[6][7]
The second phase of construction was also completed by Atkins and McNeil, starting at Bunbury and working north to Pinjarra opening on 22 August 1893.[1][3][7][6] Bunbury station was opened by Sir John Forrest on 14 November 1894.
Beyond Bunbury, the line previously continued south a further 200 kilometres to Northcliffe closing in stages from 1986.[8] Part of this section is now operated by the Pemberton Tramway Company.[9][10]
Bridges
The Bunbury Bridge was the most significant engineering structure on the line. It was replaced by the Goongoongup Bridge in 1996.
Services
Since November 1947, The Australind has traversed the length of the line from Perth to Bunbury.[11] Other named trains to have previously operated on the line were the Bunbury Belle and The Shopper. Aurizon operate coal trains on the line from Collie to Kwinana.
References
- ↑ 1.0 1.1 1.2 1.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Brookfield Rail Network Map Brookfield Rail
- ↑ Home Pemberton Tramway Company
- ↑ Pemberton-Northcliffe Railway & Railway Station Heritage Council of WA
- ↑ Australind Timetable Transwa
Further reading
- Affleck, Fred N. On track : the making of Westrail, 1950 to 1976 . Perth : Westrail, 1978. ISBN 978-0-7244-7560-5
- May, Andrew and Gray, Bill. A History of WAGR Passenger Carriages. Perth:The Author, 2006. ISBN 978-0-646-45902-8
- Use dmy dates from January 2012
- Use Australian English from January 2012
- All Wikipedia articles written in Australian English
- Pages with broken file links
- Articles that mention track gauge 1067 mm
- History of Western Australia
- Railway lines in Western Australia
- Railway lines opened in 1894
- South Western Railway, Western Australia