Rumaila oil field

From Infogalactic: the planetary knowledge core
(Redirected from Rumaila Field)
Jump to: navigation, search
Rumaila
Fire at rumaila field.jpg
Oil fire at the Rumaila oil field in 2003
Rumaila oil field is located in Iraq
Rumaila oil field
Location of Rumaila
Country Iraq
Location Basra Governorate
Offshore/onshore onshore
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Operator BP
Partners BP (47.6%),
CNPC (46.4%),
State Oil Marketing Organization (SOMO) (6%)
Field history
Discovery 1953
Production
Current production of oil 960,000 barrels per day (~4.8×10^7 t/a)
Estimated oil in place 17,000 million barrels (~2.3×10^9 t)
Producing formations Zubair of Hautervian & Barremian age[1]

The Rumaila oil field is a super-giant oil field[2] located in southern Iraq, approximately 20 mi (32 km) from the Kuwaiti border.[3] The dispute between Iraq and Kuwait over alleged slant-drilling in the field was one of reasons for Iraq's invasion of Kuwait in 1990.[4][5] This field was discovered by the Basrah Petroleum Company (BPC), an associate company of the Iraq Petroleum Company (IPC), in 1953.[6][7][8] Under Abd al-Karim Qasim, the oilfield was confiscated by the Iraqi government by Public Law No. 80 of 11 December 1961.[9] Since then, this massive oil field has remained under Iraqi control. The assets and rights of IPC were nationalised by Saddam Hussein in 1972, and those of BPC in 1975.[10] Rumaila is considered the third largest field in the world.[11]

The field is estimated to contain 17 billion barrels, which accounts for 12% of Iraq's oil reserves estimated at 143.1 billion barrels.[12][13][14]

Ownership

The field is owned by Iraq and subcontracted to BP and CNPC under Iraq Producing Field Technical Service Contract (PFTSC).[1][3] BP is an operator of the project with 47.6% while CNPC and SOMO hold 46.4% and 6%, respectively.[15] BP and CNPC will recover a renumerated fee of $2 per barrel in profits which will account to 15 to 20% rate of return on investment. Iraqi government and BP agreed to cut the initial bidding price per barrel from $3.99 to $2.00 in June 2009.[citation needed] The US changed its status of forces agreement the same month, starting to depart from Iraq. ExxonMobil which also bid on servicing this field at a price $4.80 walked away due to price cutting terms by the Iraqi Government leaving BP and CNPC as winners of the contract.[16][17][18] BP expects the costs will begin to be recovered after the production will be raised by 10% from the current output. The rehabilitation and expansion project will be managed by Rumaila Field Operating Organization (ROO) which will be staffed mainly from SOC employees, a wide range of international oilfield service providers, and smaller number of experts from BP and CNPC.[15][19]

An estimated $15 billion will be spent on enhancing the operations at Rumaila over the next 20 years.[11]

Production

As of October 2012, the field produces 1,330,000 barrels per day (211,000 m3/d) making up 40% of Iraq's oil production of 2.4 million barrels per day (380,000 m3/d).[20][21] Currently ~270 production wells are operating at Rumaila. BP and CNPC intend to raise the production to 2.1 million barrels per day (330,000 m3/d) within the next six years. Once this production milestone is reached, Rumaila will become the second largest oil field in the world after the Saudi Arabian Ghawar oil field.[11] However, it is likely that the target for peak production is cut down to between 1.8-2.2 million barrels per day (bpd), the Iraqi oil ministry and oil industry sources said.[22]

Drilling contracts

In early 2010, BP subcontracted deals valued at around $500 million to Weatherford International, consortium of Schlumberger and Iraqi Drilling Co, and Daqing Oilfield Company Limited from China to drill 49 new wells at Rumaila. Weatherford is going to drill seven wells while partnership of Schlumberger and Iraqi Drilling Co, and Daqing Oil Field Co will drill 21 wells each.[23]

In February 2011, Conceptual Design, Front End Engineering Design (FEED), Minimum Work Obligations and Integrated Project Management Team (IPMT) services contract was awarded to WorleyParsons

Reservoir

Rumaila reportedly holds an estimated 17 billion barrels (2.7×109 m3) of oil; which accounts for 12% of Iraq's oil reserves, estimated at 143.1 billion barrels.[12][13][14] The oil sits approximately 2,400 m (7,900 ft) below the surface which is considered an easy target for production.[3] At current production rate of 1,330,000 barrels per day (211,000 m3/d), the reserves-to-production ratio is 35 years.

Importance

Rumalia oil field was critical in the 1990 Gulf War. Iraq, after accusing Kuwait of allegedly side-drilling under Iraqi soil, launched an attack on Kuwait on 2 August 1990.[4][5] In addition, Kuwait had been producing quantities of oil, which were above treaty limits established by OPEC.[24]

During the Iraq Invasion in 2003, the regime of Saddam Hussein laid an 18 km long defensive minefield across it, which contained an estimated 100,000 mines.[25]

See also

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 3.2 Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Thomas C. Hayes, CONFRONTATION IN THE GULF; The Oilfield Lying Below the Iraq-Kuwait Dispute, The New York Times, September 3, 1990
  5. 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Shwadran, Benjamin "Middle East Oil: Issues and Problems", Schenkman Publishing, 1977.
  11. 11.0 11.1 11.2 Lua error in package.lua at line 80: module 'strict' not found.
  12. 12.0 12.1 Lua error in package.lua at line 80: module 'strict' not found.
  13. 13.0 13.1 Lua error in package.lua at line 80: module 'strict' not found.
  14. 14.0 14.1 Lua error in package.lua at line 80: module 'strict' not found.
  15. 15.0 15.1 Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.

External links