File:Limyra Bridge Workflow.gif
From Infogalactic: the planetary knowledge core
Size of this preview: 800 × 128 pixels. Other resolution: 1,250 × 200 pixels.
Original file (1,250 × 200 pixels, file size: 107 KB, MIME type: image/gif, looped, 8 frames, 20 s)
Summary
The possible workflow on <a href="https://en.wikipedia.org/wiki/Limyra_Bridge" class="extiw" title="en:Limyra Bridge">Limyra Bridge</a>. The double-layered arch construction offered two advantages: Firstly, the falsework could be moved to another opening as soon as the lower arch rib had been completed (saving of time). Secondly, the centering could be built more lightly due to lesser loads (reduction of weight).
Licensing
Lua error in package.lua at line 80: module 'strict' not found.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 20:58, 5 January 2017 | 1,250 × 200 (107 KB) | 127.0.0.1 (talk) | The possible workflow on <a href="https://en.wikipedia.org/wiki/Limyra_Bridge" class="extiw" title="en:Limyra Bridge">Limyra Bridge</a>. The double-layered arch construction offered two advantages: Firstly, the falsework could be moved to another opening as soon as the lower arch rib had been completed (saving of time). Secondly, the centering could be built more lightly due to lesser loads (reduction of weight). |
- You cannot overwrite this file.
File usage
The following 3 pages link to this file: