File:Limyra Bridge Workflow.gif

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Original file(1,250 × 200 pixels, file size: 107 KB, MIME type: image/gif, looped, 8 frames, 20 s)

Summary

The possible workflow on <a href="https://en.wikipedia.org/wiki/Limyra_Bridge" class="extiw" title="en:Limyra Bridge">Limyra Bridge</a>. The double-layered arch construction offered two advantages: Firstly, the falsework could be moved to another opening as soon as the lower arch rib had been completed (saving of time). Secondly, the centering could be built more lightly due to lesser loads (reduction of weight).

Licensing

Lua error in package.lua at line 80: module 'strict' not found.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current20:58, 5 January 2017Thumbnail for version as of 20:58, 5 January 20171,250 × 200 (107 KB)127.0.0.1 (talk)The possible workflow on <a href="https://en.wikipedia.org/wiki/Limyra_Bridge" class="extiw" title="en:Limyra Bridge">Limyra Bridge</a>. The double-layered arch construction offered two advantages: Firstly, the falsework could be moved to another opening as soon as the lower arch rib had been completed (saving of time). Secondly, the centering could be built more lightly due to lesser loads (reduction of weight).
  • You cannot overwrite this file.

The following 3 pages link to this file: