File:Biaschina Intermodal.jpg

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Original file(2,292 × 1,800 pixels, file size: 859 KB, MIME type: image/jpeg)

Summary

Intermodal train southbound to Italy on Gotthard line after crossing the Biaschina gorge and passing two spiral tunnels near Giornico, Canton Ticino, Switzerland

Visible are train tracks on 3 levels (spiral tunnels between them), the Biaschina-Viaduct of the A2 Gotthard-Autobahn (top left) and the hairpin-bends of the Kantonsstrasse 2 (center right)

This photo portrays complex structures

  • heavy trains need 2 locomotives to pass the steep line
  • international trucks crawl up the highway to the roadtunnel (truck traffic tenfolded since the opening of the Gotthard roadtunnel)

The new Gotthard-Basetunnel of the Alptransit initiative will pass all these difficulties due to its length and flat raillink concept.

Licensing

Lua error in package.lua at line 80: module 'strict' not found.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:53, 8 January 2017Thumbnail for version as of 17:53, 8 January 20172,292 × 1,800 (859 KB)127.0.0.1 (talk)<p>Intermodal train southbound to Italy on Gotthard line after crossing the Biaschina gorge and passing two spiral tunnels near Giornico, Canton Ticino, Switzerland </p> <p>Visible are train tracks on 3 levels (spiral tunnels between them), the Biaschina-Viaduct of the A2 Gotthard-Autobahn (top left) and the hairpin-bends of the Kantonsstrasse 2 (center right) </p> <p>This photo portrays complex structures </p> <ul> <li> heavy trains need 2 locomotives to pass the steep line</li> <li> international trucks crawl up the highway to the roadtunnel (truck traffic tenfolded since the opening of the Gotthard roadtunnel)</li> </ul> <p>The new Gotthard-Basetunnel of the Alptransit initiative will pass all these difficulties due to its length and flat raillink concept. </p>
  • You cannot overwrite this file.