Bremgarten–Dietikon railway line

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Bremgarten–Dietikon railway line (S17)
BDWM Be 4-8 Reussbrücke Bremgarten I.jpg
One of the, since sold, Be 4/8 units on the railway bridge in Bremgarten
Overview
Type Light rail
System Zürich S-Bahn
Status Operational
Locale Switzerland
Termini Wohlen, Aargau, Canton of Aargau
Dietikon, Canton of Zürich
Stations 20
Services 1
Operation
Opened 1876 (Wohlen–Bremgarten West)
1902 (Bremgarten–Dietikon)
1912 (Bremgarten West–Bremgarten)
Depot(s) Bremgarten
Technical
Line length 18.8 km (11.7 mi)
No. of tracks Mixture of single and double track
Track gauge Metre (3 ft 3 38 in)
Minimum radius 25 m (82 ft)
Electrification 1200 V DC overhead wire
Maximum incline 5.6%
Route diagram
0,0 Wohlen423 m ü. M.
1,4 Wohlen Oberdorf431 m ü. M.
4,0 Erdmannlistein441 m ü. M.
7,0 Bremgarten West401 m ü. M.
Bremgarten Isenlauf
Reussbrücke Bremgarten156 m
Bremgarten Obertor
8,2 Bremgarten390 m ü. M.
Bibenlos-Sonnenhof
9,1 Zufikon421 m ü. M.
9,7 Zufikon Hammergut
10,3 Widen Heinrüti475 m ü. M.
10,8 Zufikon Belvédère521 m ü. M.
12,2 Berikon-Widen550 m ü. M.
Zelgrank
Holenstrasse
13,5 Rudolfstetten Hofacker
14,1 Rudolfstetten471 m ü. M.
16,2 Reppischhof428 m ü. M.
Honert
17,3 Dietikon Stoffelbach
17,6 Bergfrieden413 m ü. M.
Dietikon Schöneggstrasse
Schmiedstube
Badenerstrasse
18,9 Dietikon388 m ü. M.

The Bremgarten–Dietikon railway line (German: Bremgarten-Dietikon-Bahn, BD) is a railway line in Switzerland. It connects Wohlen and Bremgarten in the canton of Aargau with Dietikon in the canton of Zürich. Passenger service on the line now forms part of the Zürich S-Bahn, branded as the S17, and a frequent service is provided, with trains running up to every 15 minutes.[1][2][3]

The line was opened in stages, and under different ownership, between 1876 and 1912. Whilst the earliest section to be opened, between Wohlen and Bremgarten, was built as a traditional branch line, the later section between Bremgarten and Dietikon was built as rural electric tramway. Whilst much of the line has been upgraded, this is still apparent in the long stretches of roadside track, and stretches of street running in Dietikon.

Today the line is owned and operated by BDWM Transport AG, a company that also operates bus services in the region.

History

Wohlen-Bremgarten railway

The route between Wohlen and Bremgarten West was built to standard gauge by the Aargauische Südbahn railway, which connected Aarau and Rotkreuz via Wohlen. The service began on September 1, 1876, operated by steam locomotives.[4]

On January 1, 1902, the Swiss Federal Railways (SBB) took over the Aargauische Südbahn. The SBB continued to operate the service as a steam operated standard gauge branch line.

Bremgarten-Dietikon tramway

Opening of the Bremgarten-Dietikon line

The line to Wohlen had several disadvantages for Bremgarten. The timetable was poor, Bremgarten West station was too far away from the town centre, and the connection to Zürich initially proceeded in the wrong direction and was very indirect. In 1895 a plan was produced for a roadside electric tramway between Bremgarten and Dietikon. As Dietikon already had a direct rail link to Zürich, this provided a much more direct connection.

Construction began in 1901, and the route was opened on April 30, 1902.[4] The new line crossed the Mutschellen pass between its two terminal points, was owned by the Bremgarten-Dietikon-Bahn company (BD), and built to metre gauge. The line's headquarters and terminus were at Bremgarten station, close to the town's centre. Besides the connection to the main line railway at Dietikon, the line shared track in Dietikon with the Limmattal-Strassenbahn, which provided a link to the Zürich city tram system.[5]

Wohlen-Dietikon through service

The terminus in Wohlen after connection of the two lines

Despite the construction of the new line, there was still a gap of about a kilometre between Bremgarten and Bremgarten West where passengers had to make their own way. The BD entered into negotiations with the SBB, and in 1910, a permanent lease for the Wohlen-Bremgarten railway line was obtained.[5]

The standard gauge line from Wohlen to Bremgarten West was converted to dual gauge (standard and metre), thus permitting standard gauge freight to continue to access Bremgarten West, and was electrified. A new terminus was constructed opposite the main line station in Wohlen. In Bremgarten, a new stretch of metre gauge line was constructed to connect the two stations, including an imposing railway bridge across the river Reuss. Through running between Wohlen and Dietikon began on February 8, 1912.[5]

Modernisation

One of the BDe 8/8 units on street track in Dietikon

After 1950 the line was modernised to suburban railway standards using new rolling stock and facilities. In 1969, the line took delivery of 9 new articulated BDe 8/8 units, which were to be the mainstay of the line for the next 40 years.

The opening of the rapid-transit Zürich S-Bahn network on May 27, 1990 caused major development. The route and timetable were integrated into the rapid-transit railway network, and three new stops with interchange facilities with other public transport modes were added.

In 1993, the line's rolling stock was augmented by 5 new Be 4/8 low-floor units. In 1995, a double-track section was built between Rudolfstetten Hofacker and Berikon-Widen, which was extended two years later to the Belveder stop.

BDWM Transport

In 2000, the BD company merged with the Wohlen-Meisterschwanden-Bahn company (WM) to form BDWM Transport AG, who still own and operate the line. Despite its name and by the time of the merger, the WM company was a bus operator, and BDWM Transport operates a number of bus services in addition to the Bremgarten–Dietikon line.[4]

In 2010, the BDWM took delivery of the first of 14 new ABe 4/8 articulated low floor units, intended to replace all the previous units. The 40-year-old BDe 8/8 units were, with the exception of the preservation of a single unit, scrapped. The 17-year-old Be 4/8 units were sold to the Wynental- und Suhrentalbahn.[6]

End of the standard gauge

The last standard gauge freight train operated to Bremgarten in 2009, although occasional standard gauge passenger trains aimed at the rail enthusiast market have run since. When track renewal was due in 2015, the decison was made to relay the line as meter gauge only. The end of the standard gauge was marked with special trains on June 26-28, and on July 13 all service was suspended between Bremgarten West and Wohlen for the removal of the standard gauge track and renewal of the meter gauge track. The line is expected to reopen on 27 July 2015.[5][7]

Operation

Route

Map of the line

The line begins in Wohlen at a platform opposite the SBB Wohlen station at an altitude of 426 m (1,398 ft). The line climbs to an altitude of 451 m (1,480 ft) and passes into the Bremgarterwald (Bremgarten Forest). The Erdmannlistein stop lies in the middle in the forest and serves exclusively trip traffic. After 6.6 km, the Bremgarten West station is reached. This was originally the terminus of the old standard gauge branch railway whose route has been followed since Wohlen, and hus far the line is rather flat (maximum gradient of 1.5%), has gentle turning radii (minimum 300 m or 984 ft) and resembles a normal SBB standard gauge line. After Bremgarten West, the line changes its character completely, adopting the sharper curves and steeper gradients of a narrow gauge line.

After negotiating two sharp curves out of Bremgarten West station, the line runs along the 156 m (512 ft) long bridge over the Reuss. The company's headquarters, including a depot and administration building, are located at Bremgarten station at an altitude of 389 m (1,276 ft). From here on the line runs alongside the main road through a more densely populated, although still rural, area. A series of exceptionally tight U-shaped curves takes the line uphill, at slopes of up to 5.6%, to Berikon-Widen station on the Mutschellen pass at an altitude of 553 m (1,814 ft). From here the line drops through equally tortuous curves to Rudolfstetten Hofacker, where the downward gradient becomes gradually flatter. From Bergfrieden station the line has tramway-like characteristics with street-running. The line ends at Dietikon station at a platform beside the SBB tracks and at an altitude of 391 m (1,283 ft).[8]

Infrastructure

An ABe 4/8 unit at the Heinrüti halt on the climb to the Mutschellen pass; note the continuation of the track alongside the road to the middle left.

The line is 18.8 km (11.7 mi) long, of which 1.6 km (1.0 mi) is double track and the rest single track. It has a minimum curve radius of 25 m (82 ft), and a maximum gradient of 5.6%. A section of 0.8 km (0.5 mi) length in Dietikon runs in the street, sharing its road space with other traffic. The line is equipped with metre gauge (1,000 mm (3 ft 3 38 in) gauge) track throughout, and is electrified at 1200 V DC, using an overhead line.

Services

The passenger services on the line now forms part of the Zürich S-Bahn, branded as the S17. A service of two trains per hour is provided every day between Wohlen and Dietikon. Except on Sundays and public holidays, an extra two trains per hour are provided between Bremgarten West and Dietikon. Apart from a small number of additional peak-hour express trains, all trains serve all stops, taking just over 30 minutes for the full length of the line.[2][3]

Rolling stock

The line uses the following rolling stock:

Image Numbers Notation Year Notes
BDWM BDe 8.JPG 7 BDe 8/8 1969 Articulated unit from the class of vehicles that operated the line for 40 years from the late 1960s. Built by Maschinenfabrik Oerlikon, this unit is preserved and used on special services. (Illustration is of a, since scrapped, unit of the same class).
S17 Dietikon - Wohlen Bremgarten station II.jpg 10 BDe 4/4 1928 Bogie motor car, preserved and used on special services.
51-52 Tm 2/2 1967-68 Diesel shunters
BDWM-500x.JPG 5001–5014 ABe 4/8 2010-11 Articulated low floor units built by Stadler Rail, which now operate all regular passenger services.

Future

For many years there has been a plan for a tunnel between Bergfrieden and Dietikon, in order to avoid the tramway-like section. However, in times of limited funds such a project (its practicality being extremely questionable) is probably not realisable.[citation needed]

More realistic is the project for a light rail system in the densely populated Limmattal area, west of Zürich. Continuing from the BD line the first stage would lead from Dietikon to Spreitenbach and Killwangen. The second stage would be from Dietikon through Urdorf and Schlieren to Zürich-Altstetten railway station, with connection to the Zürich tram route 2 (Verkehrsbetriebe Zürich) at the Farbhof terminus.[9]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 4.2 Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 5.2 5.3 Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Zürcher Planungsgruppe Limmattal (German)