The BORAX Experiments were a series of safety experiments on boiling water nuclear reactors conducted by Argonne National Laboratory in the 1950s and 1960s at the National Reactor Testing Station in eastern Idaho.[1] They were performed using the five BORAX reactors that were designed and built by Argonne.[2] BORAX-III was the first nuclear reactor to supply electrical power to the grid in the United States in 1955.

Evolution of BORAX

This series of tests began in 1952 with the construction of the BORAX-I nuclear reactor.[4][3] BORAX-I experiment proved that a reactor using direct boiling of water would be practical, rather than unstable, because of the bubble formation in the core.[5] Subsequently the reactor was used for power excursion tests which showed that rapid conversion of water to steam would safely control the reaction. The final, deliberately destructive test in 1954 produced an unexpectedly large power excursion that "instead of the melting of a few fuel plates, the test melted a major fraction of the entire core." However, this core meltdown and release of nuclear fuel and fission products provided additional useful data to improve mathematical models. The tests proved key safety principles of the design of modern nuclear power reactors. Design power of BORAX-I was 1.4 megawatts thermal. The BORAX-I design was a precursor to the SL-1 plant, which was sited nearby and began operations in 1958. The principles discovered in the BORAX-I experiments helped scientists understand the issues which contributed to the fatal incident at SL-1 in 1961.

The BORAX-II reactor was built in 1954, with a design output of 6 MW(t). In March 1955 BORAX-II was intentionally destroyed by taking the reactor 'prompt critical'.

The design of BORAX-II was modified into BORAX-III with the addition of a turbine, proved that turbine contamination would not be a problem. It was linked to the local power grid for about an hour on July 17, 1955.[6] BORAX-III provided 2,000 kW to power nearby Arco, Idaho (500 kW), the BORAX test facility (500 kW), and partially powered the National Reactor Testing Station (after 2004, the Idaho National Laboratory) (1,000 kW). Thus Arco became the first city solely powered by nuclear energy. The reactor continued to be used for tests until 1956.

BORAX-IV, built in 1956, explored the thorium fuel cycle and uranium-233 fuel with a power of 20 MW thermal. This experiment utilized fuel plates that were purposely full of defects in order to explore long-term plant operation with damaged fuel plates. Radioactive gasses were released into the atmosphere.

BORAX-V continued the work on boiling water reactor designs, including the use of a superheater. It operated from 1962 to 1964.

BORAX-I Destructive Test and Cleanup

Test synopsis: "The (test was) carried out by withdrawing four of the five control rods far enough to make the reactor critical at a very low power level. The fifth rod was then fired from the core by means of a spring. In this test, the rod was ejected in approximately 0.2 seconds. After the control rod was ejected, an explosion took place in the reactor which carried away the control mechanism and blew out the core. At half a mile, the radiation level rose to 25 mr/hr. Personnel were evacuated for about 30 minutes."[7]

The destruction of BORAX-I caused the "aerial distribution of contaminants resulting from the final experiment of the BORAX-I reactor" and the likely contamination of the topmost 1 foot of soil over about 2 acres in the vicinity.[8] The site needed to be cleaned up prior to being used for subsequent experiments. The 84,000-square foot (7,800 m2) area was covered with 6 inches of gravel in 1954, but grass, sagebrush, and other plants reseeded the area since then. The BORAX-I burial ground is located about 2,730 feet (830 m) northwest of the Experimental Breeder Reactor-1, a publicly accessible national monument. Since 1987, the United States Environmental Protection Agency has classified the burial ground as Superfund site Operable Unit 6-01, one of two such sites (along with SL-1) at the Idaho National Laboratory. In 1995, the EPA ordered the primary remedy of the burial ground should be: "Containment by capping with an engineered barrier constructed primarily of native materials."[8] The site is expected to produce no more than a 2 in 10,000 increase in cancer risk for long term residential use after 320 years, with no significant decrease after that time. This risk calculation ignores the shielding provided by the soil cover, which at the time of the EPA decision had reduced exposure to little more than background level, and makes very pessimistic modeling assumptions that greatly increase the projected risk, to deliberately err on the high rather than low effect side.[8]

See also

References

Notes
  1. Light Water Reactor Technology Development, Argonne National Laboratory
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Haroldsen 2008, p. iv-v.
  4. BORAX was a contraction of the words “boiling water reactor experiment".[3]
  5. Haroldsen 2008, p. 35.
  6. Lua error in package.lua at line 80: module 'strict' not found. AEC Press release for BORAX-III lighting Arco, Idaho.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. 8.0 8.1 8.2 Lua error in package.lua at line 80: module 'strict' not found.
Bibliography
  • Lua error in package.lua at line 80: module 'strict' not found.

External links

Lua error in package.lua at line 80: module 'strict' not found.